! Fi-om: mike@neuharthcancrete.corri - <br /> Wednesday, March 08, 2017 <br /> tear off wall and side wall of garage:tear off blocks that were bowed out and shifted out due to <br /> pressure from inside of garage,took out apx. 7 courses down to where blocks were structural sound, <br /> relayed blocks up to 1 course above garage floor, poured blocks solid with concrete every 4 feet to <br /> prevent bowing with number 4 rods tied into garage floor. Back filled with base material and compacted <br /> in 1 foot lifts. <br /> Poured faotings bet � <br /> slab from settling . I believe third stall had footings there already. <br /> Poured 4 inch garage floor with rods at 30 inches on center each way. <br /> Family room: installed bracing ta hold up joist,tore down biocks.Tore out sfab that w�- <br /> biocks beneath, relayed blocks up on top of existing blocks that were underneath slab, I believe this was <br /> a garage at some point and the slab was poured over blocks and then framed on at some point. <br /> From: mike(�neuharthconcrete.com <br /> Tuesday, March 07, 2017 <br /> As far as inspectors go,all the block walls we tare out were laid back up on blocks,not footings so there <br /> was no need for an inspector in my opinion as footings were below frost.As for footings between garage <br /> doors,there wasn't any structure support so don't#hink inspector was needed there either. <br /> ,�l-'�✓' f�e -�uc� �2�^w►�"T� <br /> ���F�7.'?"� ev�' �:r:'.`^ <br /> �tl�ll � n s��c cf a cl �eK ����e� wn,�� co���.���� ���y ������a <br /> �/m C� � �a�'+ ���l �� p��"rys Da+� ,� / 7 <br /> R�vie��r <br /> � <br /> ���. �i'�° �� <br /> �:�'��'������ �+t,��� <br /> I�tLt�yEb <br /> MAR 1 52U1� <br /> C�N�F ORONO <br />