Laserfiche WebLink
PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: � �� �/��w� BGt',� �j�y u7"i'� Permit No.: ?� � 7" ��� <br /> Description of work: Date Rec'd: <br /> Septic review by: Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: Date Approved: � l� <br /> Grading review by: Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Coverage: SF % <br /> Survey Submitted: � Yes o Date of Surve � Revised date(?): <br /> Landscape plan submitted? � Yes � No Landscaper• <br /> Proposed Setbacks: <br /> Front(Lake) Rear(Street) ( N E W ) N S E W ) Other Buildings Wetland <br /> ide Side <br /> Defined Height: Peak Height: F E: FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet) = 50 0 = L.F. below grade <br /> Basement? � Yes � No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the Iowes oposed Slab at or above grade— <br /> START WITH floor(of the basement or crawl s a e)and measure from highest existinq <br /> the highest point of the roof. START W ITH ra ade to the highest point of the <br /> roof even if fill was brought in to <br /> elevate home. <br /> If you have a... <br /> SUBTRACTION • GABLE OR HIPPED R OF(no Slab below grade—measure <br /> (BASED ON windows): Subtract h f the dista ce from highest existing grade to the <br /> ROOF TYPE) between the highest p int of the r of hi hest oint of the roof. <br /> to the low point of the correspondi If you have a... <br /> gable or hipped roof SUBTRACTION ' GABLE OR HIPPED ROOF <br /> • GABLE OR HIPPE ROOF(with (BASED ON (no windows): Subtract half <br /> windows): Subtrac half the distance ROOF TYPE) <br /> the distance between the <br /> highest point of the roof to <br /> between the top of he highest the low point of the <br /> window and the hi hest point of the corresponding gable or <br /> roof hipped roof <br /> • ALL OTHER ROpF TYPES(flat, . GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distanc�'between the half the distance between <br /> (BASED ON basemenUcrawl spaie floor and the the top of the highest <br /> EXISTING highest existing gra e adjacent to the window and the highest <br /> GRADES) foundation OR 10�et(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />