My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00123 - mechanical
Orono
>
Property Files
>
Street Address
>
B
>
Bridgewater Drive
>
765 Bridgewater Drive - PID: 33-118-23-12-0090 - New Address, New PID
>
Permits/Inspections
>
2017-00123 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:47 PM
Creation date
4/27/2017 9:32:29 AM
Metadata
Fields
Template:
x Address Old
House Number
765
Street Name
Bridgewater
Street Type
Drive
Address
765 Bridgewater Drive
Document Type
Permits/Inspections
PIN
3311823120090
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erosion Control Supplemental Information <br /> Final Stabilization will be provided with(seed, sod, etc): �Q� <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout: Location of concrete washout <br /> �ff site _Indicated on site plans _Other(description): _Contained on truck: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater, of all vegetation to be retained. <br /> �Yes _Not Applicable _Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects disturbing'/4 acre or <br /> greater. The inspection requirements are as follows: <br /> 1) The individual ident�ed as being responsible for implementing the erosion control <br /> plan mz�st roa�tinely inspect the constrz�ction site once every seven days darring active <br /> constrt�ction and within 24 hours after a rainfall event greater than 0.5 inches in 24 <br /> hozrrs. <br /> Z) All inspections and maintenance conda�cted dz�ring construction must be recorded in <br /> writing and these records mzast be retained with the erosion control plan and made <br /> available at the District's request within 24 hours. Records of each inspection and <br /> maintenance activity shall include: <br /> i. Date and time of inspections; <br /> ii. Name of person conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates, times and party completing <br /> maintenance activities); and <br /> v. Date and amoarnt of all rainfall events greater than 0.5 inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name J�.�1 N� W �'�r� �,� <br /> Organization C'�C� �1 1/Ir� �, � V� �,1�t�S aL r�' <br /> . <br /> Phone ��� /����o / Alternate Phone g S/1 �.3 y S`�S y,3 <br /> Email .�_E_pi VJ � W 00����� �i�i�I�G�L.� . C� w» <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> �---- --�'\ <br /> �� _�_��_ <br /> Sign�'�ature of Applicant or Authorized Agent Dat <br />
The URL can be used to link to this page
Your browser does not support the video tag.