My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-1975 Council Meeting Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1975
>
11-10-1975 Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2015 2:45:42 PM
Creation date
4/17/2015 2:45:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> � <br /> ORONO COUNCIL i•4EETING HELD NOVET�ZBER 10, 1975 Page 6 <br /> Paurus moved, Butler seconded, that Resolution RESOLUTION #645 <br /> � #k645, A Resolution Granting Richard Y.ennedy A Richard Kennedy <br /> Variance From The Orono Zoning Code To Allow 2435 Scotch Pine Lane <br /> Fill To Be Placed Above The 930 Contour Level, <br /> ` Along The Westerly Lot Line Of His Property, <br /> Within The 26 Foot Setback From The Marsh, But <br /> Not To Extend Into The AZarsh Itself, be adopted. <br /> Motion, Ayes (3) - Nays (0) e <br /> � <br /> Butler moved, Paurus seconded, to employ P�4rs. EP�ZPLOYMENT <br /> Betty Wallin, Route 5, Mound, as clerk- Betty Wallin <br /> receptionist, effective October 28, 1975, at <br /> a beginning salary of $2.60 per hour and an <br /> evaluation after :three months. Motion, <br /> Ayes (3) - Nays (0) . <br /> Butler moved, Paurus seconded, to adopt RESOLUTION #646 <br /> Resolution #646 allowing r1r. Red Daniels Red Daniels <br /> thirty days leave with pay and other accrued <br /> benefits for a disability discharge with <br /> final termination December 7, 1975 at 4: 30 P.M. <br /> T�lotion, Ayes (3) - Nays (0) . <br /> Dick I3enson, City Administrator, informed the 73-1 COMPLETION <br /> City Council that the 73-1 sewer construction <br /> lines and lift stations have been approved by <br /> Orr-Schelen-Mayeron. The Engineer°s memo <br /> which states thata <br /> * "This firm, along with people from your public <br /> � works staf f, have given a final inspection to <br /> the 73-1 project. The sewer pipe, lift stations <br /> � and appurtenances were approved as complete <br /> ' and operational on October 31. There are two <br /> exceptions to total operation. One is the <br /> grinder pump on the Goetschell property and <br /> the other is the grinder pump on the Hurr <br /> property, Each of these have a minor electrical <br /> problem which should be cleared up today. <br /> Therefore, except for these two locations the <br /> citizens may connect to the sewero <br /> The final inspection included preparing a <br /> punch list of restoration items to be completed, <br /> � These should be completed by the end of this <br /> week, I am also giving to the Contractor today <br /> a copy of all the letters I have to date wnich <br /> were returned from your recent mailing, The <br /> majority of the items in these letters were <br /> �lready on the punch list and the additional <br /> ones were minor in nature and should be completed <br /> this week also. " <br /> Wayne R, Long <br /> (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.