Laserfiche WebLink
, , <br /> Christine Mattson <br /> From: Christine Mattson <br /> Sent: Friday, September 13, 2013 4:18 PM <br /> To: 'Julie Kapsner'; 'Brian McCullough'; markg@gronbergassoc.com <br /> Cc: Melanie Curtis <br /> Subject: 75 Leaf Street/#2013-000233 <br /> City Engineer,Jesse Struve, has reviewed the survey dated 8-06-2013 which was received on August 28, 2013 and has <br /> the following comments: <br /> • All proposed retaining walls must have top of wall (TW) and bottom of wall (BW) labeled. The proposed <br /> retaining walls are not labeled. Retaining walls over 4' must be engineered. <br /> • The current layout shows retaining walls constructed right up to the wetland buffer edge. The way it is shown, <br /> the contractor cannot construct the retaining walls without impacting the wetland buffer area. If they want to <br /> do the work as shown,they will need to include a planting plan, and provide the proposed see mixture. <br /> Please don't hesitate to contact us if you have any questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway Orono MN 55356 (physica/address) <br /> PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ <br /> � 952.249.4620 8 952.249.4616 <br /> �3 cmattson@ci.orono.mn.us � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm � �~ "� <br /> �� � �� � <br /> a���- <br /> � <br /> � �� , <br /> -s�-�-�►�o�...Q.� <br /> ���� �� � � <br /> �o��3 . t�� t-�us�(� <br /> V,f�aw.. o F..,-a,�f.l <br /> � 1 <br />