Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Jesse Struve � <br /> From: Jesse Struve <br /> Sent: Wednesday, September 25, 2013 10:50 AM <br /> To: Melanie Curtis <br /> Cc: Christine Mattson <br /> Subject: 20130925 75 Leaf St#13-00233 <br /> Melanie, <br /> I have reviewed the proposed pool location and am fine with what is being proposed, but the applicant should be aware <br /> of: <br /> 1. The survey shows proposed walls extending right up to the existing buffer area. They will impact the buffer <br /> during construction and will need to restore all impacts with approved seed mixture. <br /> 2. By installing the walls up to the buffer line,this will not allow for a mow able area next to the retaining wall <br /> which may be problematic for the owners to maintain. <br /> 3. All retaining walls shown on the survey appear to meet the height requirements(below 4'). If any of the walls <br /> are installed over 4'or any tiered walls which exceed 4' not separated by 2x the height,the applicant will be <br /> required to have an engineer review and sign off on the walls. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661- Direct <br /> (952) 249-4616- Fax <br /> www.ci.orono.mn.us <br /> 1 <br />