Laserfiche WebLink
Christine Mattson <br /> From: Christine Mattson <br /> Sent: Monday, September 16, 2013 2:45 PM <br /> To: 'Mark Gronberg' <br /> Cc: Julie Kapsner; Brian McCullough; Melanie Curtis <br /> Subject: RE: 75 Leaf Street/#2013-000233 <br /> Mark, <br /> When you say later version, do you mean a survey dated after 8-6-13? If so,we do not have a copy of a survey dated <br /> after 8-6-13, please provide two for us to review. <br /> Thanks! <br /> Christine� <br /> From: Mark Gronberg [mailto:markg@gronbergassoc.com] <br /> Sent: Friday, September 13, 2013 4:34 PM <br /> To: Christine Mattson <br /> Cc: Julie Kapsner; Brian McCullough; Melanie Curtis <br /> Subject: Re: 75 Leaf Street/ #2013-000233 <br /> I am sure there is a later version of the survey that addressed these items. <br /> Sent from my iPhone <br /> On Sep 13, 2013, at 4:18 PM, Christine Mattson <CMattson@ci.orono.mn.us>wrote: <br /> City Engineer,Jesse Struve, has reviewed the survey dated 8-06-2013 which was received on August 28, <br /> 2013 and has the following comments: <br /> • All proposed retaining walls must have top of wall (TW) and bottom of wall (BW) labeled. The <br /> proposed retaining walls are not labeled. Retaining walls over 4' must be engineered. <br /> • The current layout shows retaining walls constructed right up to the wetland buffer edge. The <br /> way it is shown,the contractor cannot construct the retaining walls without impacting the <br /> wetland buffer area. If they want to do the work as shown, they will need to include a planting <br /> plan, and provide the proposed see mixture. <br /> Please don't hesitate to contact us if you have any questions. <br /> Christine Matfson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway Orono MN 55356 (physical addressJ <br /> PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ <br /> �' 952.249.4620 � 952.249.4616 <br /> � cmattson@ci.orono.mn.us � www.ci.orono.mn.us <br /> 1 <br />