My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00426 - new septic
Orono
>
Property Files
>
Street Address
>
L
>
Leaf Street
>
75 Leaf Street - 05-117-23-11-0014
>
Septic
>
2012-00426 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:42 PM
Creation date
4/26/2017 3:28:00 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Leaf
Street Type
Street
Address
75 Leaf St
Document Type
Septic
PIN
0511723110014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> Minnesota Pollution • UN I V ERS[TY � - <br /> C o n t r o l A g e n c y Des�gn Worksheet OF MINNESOTA � ,��� <br /> 1. Select Number of Perforated Latera(s in system/zone: 3 CiQO� <br /> ��p���1,�° ���' Minimum� 4��� <br /> (2 feet is minimum and 3 fee[is maximum spocing) G A'perforatians spaced 3'apart 2'of rock <br /> 2. Select Perforation Spacing: 3.0 ft � 1z� <br /> ������ca�n�n� �. s������ <br /> o�o����o�� 9"ofrock'�o��o��b�o��s�a �o <br /> _o`oo'�o��o'i�"po or' �� s'o' oCEio`7u�"-�Sd' <br /> 3. Select Perforation Diameter Size 7�32 1n�h per�ora[ion sliing'h'[o Y" <br /> Perforation acin :2'ro 3' <br /> 4. Length of Laterals =Media Bed Length-2 Feet. Perforatfon can not be closer then 1 foot jrom edge. v 11.05.31 <br /> 63 - 2ft = 61 ft <br /> 5• Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforotion Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft .- �ft = 20 Spaces <br /> 6. Number of Perjorations per Lateral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforotforrs Per Lateral = 20 Spaces + t = 21 Perfs. Per Lateral <br /> Check tvbfe below to verijy the number of perforations per(ateral guarantees less thvn a f0%discharge variotion. The votue is <br /> double if the a center rtwnifo(d is used. <br /> Maximum Numbe�of Perfaratiom Prr t.strral to GauraMev<70%D'escharge Variation <br /> ',Inc P orationz 7l32 Inch Pc'io�aciorx <br /> Pipe Diartfetcr tlrxhesy Perforatio�Spacing Pipe Diameter(4ncF.es> <br /> Perforation Spscing(Fce[) <br /> t tiE 7vz 2 3 lFeetl 1 7S4 tv: 2 3 <br /> 2 10 13 1a 30 60 2 1/ 76 21 3a 68 <br /> 2t� 8 12 16 28 54 2r 10 1a 20 32 64 ; <br /> 3 B 12 16 25 52 3 9 14 19 30 60 � <br /> 3%161nch Pe�rforaiiom 1:8 Inch Perforatio+u I <br /> PerFontion Spxing IFeet) Pipe Diametor(InchQzl Perforation Spxi�g Pipe P:ameter Iinchas) <br /> t �w 112 2 3 (FQet{ 1 tu f�4 2 3 � <br /> 2 1Z 18 2b 46 67 2 21 33 i4 74 144 <br /> 2tZ 72 17 2� 40 80 2v: 20 30 47 69 135 <br /> 3 12 16 22 37 TS 3 20 29 3a 6A 12E <br /> �- Tota[Number of Perforntrons equals the Number of Perforations per lateral (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Pert. Per Lateral X �Number of Perf. Laterals = 63 Total Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended value!s 4-f0 ft z per perforation. ""`°^"°"01di�'��GPMj <br /> Does not apply to At-Grades ,,,,,�„> '�``°`�"°�D1a�` <br /> ,,. ,,,. -,� ,,. <br /> Bed Area = Bed Width{ft)X Sed Length(ft) <br /> �.0 o.�s o.si o.0 o.ss <br /> 1.5 0.22 O.S1 0.6f O.! <br /> 10 rt x 63 ft = 630 ftZ i� a.x 0.59 a.p ,A. <br /> :.s o.r a.� a.n �.,� <br /> 3.0 0.32 0.72 O.f! 1.m <br /> Square Foot per Perforotion =Bed AreQ divided by the TotQ(Number of Perforntfons (Line 7). •.� �.» o.� ,.,� ,.•� <br /> S.0 0.�1 0.97 /.T6 1.65 <br /> Dwelli�s with J/t01rch to 1/s i�ch <br /> 630 tt2 .- 63 pertorations = 10.0 ft2/perforations '`°°` v�•�a.�� <br /> Dwelfl�s with�/8 irich perforat6i¢ <br /> 2 feec p�1xr eua0lhMnenn and MSTS wk�3/16 <br /> 9. Select Minimum Average Head: 1.0 fC Inc�to II11nc�D�No�atiom <br /> 5 feet aher estaMkhnents and N57S wit�t/6 inc� <br /> pertoratbm <br /> 10. Select Perforntion Dlscharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> �1• Determine required F(ow Rate by multlptying the Tota!Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br /> 63 Perforations X 0.56 GPM per Pertoration = 36 GPM <br />
The URL can be used to link to this page
Your browser does not support the video tag.