Laserfiche WebLink
a � . <br /> � OROivO COUNCIL FIE�TING HELD OCTOBER 27, 1975 Page 2 <br /> • Butler moved, Paurus seconded, that the request VARIANCE <br /> for a variance for a garage setback for I-�ary 3271 Casco Circle <br /> �Lang and i�is, Gomez, 3271 Casco Circle, be <br /> � referred to the Planning Commission, F�Totion, <br /> Ayes (4) - Nays (0) . <br /> • <br /> � Fienry T�TuYiich, Eiuilding & Zoning Administrator, VARIANCE <br /> stated to the City Council that staff has 2435 Scotch Pine Lane <br /> � reached a viable solution to the Richard Kennedy, <br /> + 2435 Scotch Pine �ane, v�riance request. <br /> � �ir, Frank Burg addressed himself to the City <br /> Council stating that he met at the City <br /> r Administration building October 24, 1975, 1a00 P.t2, <br /> with i�Tr, nick Benson, City Administrator; rZr. <br /> � Henry iJluhich, Building & Zoning Administrator; <br /> � %Iro SkiP P3cCornbs, City Engineer; and P�r, Rick <br /> Sather, rTcCombs-Knutson staff, to reach a <br /> � solution to his client's variance requesto IIr, <br /> :3urg stated that he has revised his original <br /> � Plan and does �ro�ose to stay above elevation 930 <br /> to the edge of the wetlands and will not attempt <br /> to fill wetlands as proposed before. <br /> � Planninc� Commission Chairman John Guthrie and <br /> � Comrnission member I3rad Van Nest reviewed the <br /> revised plans and concur that the revision was <br /> + an acceptable alternative. The City Engineer°s <br /> merno dated October 27, 1975 was introduced, which <br /> ` stated thato <br /> � "In accordance �aith the Council°s instructions, <br /> � ��e have met with P1r. ICennedy°s engineer, Frank <br /> Burg of Consulting Engineers Diversified to review <br /> � a revised proposal for a filling of a portion of <br /> the subject lot, I�ir, Kennedy has revised his plan <br /> � (see attached copy) to correspond generally with <br /> our suggested alternative solution to his original <br /> � proposal; as outlined in our letter of October B, <br /> 1975a I7r, ICennedy's current proposal calls for <br /> � fill to be placed above the 930 contour elevation, <br /> � along the westerly lot line of his property, This <br /> fillinc�, although it is proposed within the 26 foot <br /> � setback from the marsh, iaould not extend into <br /> the marsh itself, and would not rec�uce the 100 year <br /> r storm storage capacity, nor would it c'.ecrease <br /> the nutrient assirnilation capacity of the marshe <br /> � From an engineering standpoint, therefore, we <br /> • do not find the proposal objectiona�le, as long <br /> as the area distrubed by earth work operations is <br /> � sodded as quickly as possiblee <br /> ` <br /> � (Continued) <br /> � <br /> r <br />