My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987 septic design
Orono
>
Property Files
>
Street Address
>
L
>
Landmark Drive
>
255 Landmark Drive - 05-117-23-23-0037
>
Septic
>
1987 septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:20:23 PM
Creation date
4/26/2017 1:24:09 PM
Metadata
Fields
Template:
x Address Old
House Number
255
Street Name
Landmark
Street Type
Drive
Address
255 Landmark Dr
Document Type
Septic
PIN
0511723230037
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� , <br />� y . . <br /> ti • , + . . <br /> S-P TESTII'VG, INC. ` , <br /> . 961 KATYDID LANE � ' <br /> ST. MICHAEL, MN 56378 ' <br /> 497�3588 � ' ' <br /> . STEVE�IIi1MER8 <br /> ' August 11, 1987 <br /> Landmark Construction <br /> Lot 3, 3820 Bayside Rd. . <br /> Orono, Henn. Co. , MN. <br /> This system is designed for a Type 1, four bedroom home and in accordance <br /> witYi the Minnesota Pollution Control Agency standards WPC 40 and local <br /> ordinances. <br /> The soils on this site are typical of SCS soils mapped - KkC - Kilkenny <br /> loam. A seasonally high water table was loacated� at the su�rface. This <br /> area has beEn e�tcavated. Assuming the seasonally� high water table at the <br /> surface, a pressurized mound system will need to be installed. The � <br /> bottom of the rock bed must be located at least 3.' above the seasonally <br /> high water table. � • <br /> The soils at a depth of 18" have a percol�tion rate averaging 22.8 min/inch <br /> and are adequate for treating septic effluent. ; <br /> A pumping chamber will need to be installed to lift the efflue�t to the <br /> treatment area. ' . <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber. The distribution pipes shall have their' ends capped. Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over, just break up the sod, be sure <br /> , not to over work. . <br /> The power supply and switches must be located outside ths manhole and <br /> pumping chamber in a weather proof �nclosure. A �warning device must be <br /> installed with a light and sound device, this is in case' of a pump failure. <br /> (Mercury floats are a good method) . . <br /> All neighboring wells are located more than 75' away from the proposed <br /> treatment area. . <br /> Keep all heavy equipment off of �the proposed trea�ment area before and <br /> after construction as much as possible. The treatment area should be <br /> marked off before construction. � <br /> With proper installation and maintenance, this system. should have no <br /> problem in treating septic effluent effectively. • • <br /> It is recommended that the septic �tanks be pumped every 2 years. <br /> Soil and Pe�colat[on Testa � `� " `' ' ," — <br /> Septtc Syite�n De�t�n $teven B. Schirmers <br /> . <br /> SBS/ds . ' • <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.