My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-001496 - septic system
Orono
>
Property Files
>
Street Address
>
L
>
Landmark Drive
>
175 Landmark Drive - 05-117-23-22-0011
>
Septic
>
1988-001496 - septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:19:49 PM
Creation date
4/26/2017 12:05:36 PM
Metadata
Fields
Template:
x Address Old
House Number
175
Street Name
Landmark
Street Type
Drive
Address
175 Landmark Dr
Document Type
Septic
PIN
0511723220011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ,'� • <br /> . � a � � <br /> r. rm�t - �' � � -_;' ', <br /> _ S-�' �'�S � Il��� �1'��. � C�6 <br /> 951 KATYDiD LANE � `y�$ <br /> ST. MICHAEL, MN 55376 ! NOV � 3 � ,,: ,: <br /> 457-3566 ,..`.�'✓ <br /> S7EVE SHIRMERS <br /> August 1.2 , _ <br /> Landmark Construction <br /> Lot 2 , 3820 Bayside Rd. <br /> Orono, Henn. Co. , MN. � <br /> This, system is designed for a Type 1, four bedroorri home and in accordance <br /> with the Minnesota Pollution Control Agency standards WPC 40 and locai <br /> ordinances . <br /> The soils on this site are typical of SCS soils mapped - KkD - Kilkenny <br /> loam. A seasonally high water table was located at 12" , i6" , 1B" , & 20" , <br /> (mottling) . Due to the seasonally high water table, a pressurized mound <br /> system will need to be installed. The bottom of the rock bed must be lo- <br /> cated at least 3 ' above the seasonally high water table . <br /> The soils at a depth of 18" have a percolation rate averaging 10 . 4 min/inch <br /> and are adequate for treating septic effluent. <br /> A pumping chamber will need to be installed to lift the effluent to the <br /> treatment area. <br /> The manifold and supply line pipe must have back drainage to tne ��ump�ng <br /> chamber . The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are clean. The sod iayer below the <br /> entire mounded area must be turned over , just break up the sod, be sure <br /> not to over work. <br /> The power supply and switches must be iocated outside the manhole and <br /> pumping chamber in a weather proof enclosure. A warning device must be <br /> installed with a light and sound device, tr.is is in case of a pump faiiure . <br /> (Mercury floats are a good method) . <br /> All neighboring wells are located more than 75 ' away from tY:e proposed <br /> treatment area. <br /> Keep all heavy equipment off of the proposed treatment area before and <br /> after construction as much as possible. The treatment area shouid be <br /> marked off before construction. <br /> With proper installation and maintenance, this system snouid have no <br /> problem in treating septic effluent effectively. <br /> It is recommended that the septic tanks be pumped every 2 years . <br /> �!-;!= �� f � � <br /> Soil and Percolate�n festa �''� � � <br /> Steven B. Schirmers <br /> Septic Syatem Deaign <br /> • SBS/ds <br />
The URL can be used to link to this page
Your browser does not support the video tag.