Laserfiche WebLink
� °� <br /> o � o . . <br /> ,� ����� �- - CITY of ORONO � � <br /> �'���' <br /> '�, ��� �.r .M�t�� o�� <br /> ��ii�,�� „ g�'y . ' Street Address: Mailin�A�drou: ' . <br /> ES�IO . . 2750 Kelley Packway P.O.Bax 66 <br /> _ � O�ono� MN .55356� .� � Crystal Bay� MN 55323-0066 <br /> - 95a-�49-y600 � � <br /> To G�trrent Owner: Address: S S L�'^v �ti r'�C. a l'_ <br /> City Ordinance 199 requ'�res that each existing on-site uwage treatment system in Orono be inspected every two years. <br /> The on-site sewage treatmeat system at the above address has been inspected and appears to fall into the categories checked below. <br /> STEM CONFORMITY 1-3 : � <br /> 1 "CODE SYSTEM"M ISTS which meets all the location.daign and eonsorue6on standards of the cuaent Orono Municipal Code. <br /> 2 "COMPLIANT SYSTEM" An iSTS which does not meet all the location.daign and conswction standards of the eurrrnt Oeono Municipal <br /> Code but does meet the three foot separation requirement or two foot rcquirement for systems installed 1996 or earlier,and which is aot failing or <br /> an inuninent threat to pablic health or safery. <br /> 3 "NON-COMPLIANT SYSTEM" A prohibited ISTS;an ISTS located within a designated 100-year flood plain,any ISTS which may, . <br /> or may not mea all the locallon.design,or wnstruction standards of t�e cucrent Orono Municipal Code aad whtch is failiag for aay reaton;and <br /> any ISTS with las than t}uee feet of unsaturated soil or sand between the dis�'bution deviee and the limiting aot]eharacuristIcs. <br /> �ANK CONDITION(�-:7): � . � <br /> Tank inspection indicates: . � . <br /> 5� Pumpout not needed at this time. � <br /> 6 Septic tanks must be pumped out tt►is yeaz (city code requires tanks to be pumped out once every 3 years. <br /> Tank was last pumped �-��-d{ ). • <br /> Make sure seotic tanks are oumued throu�h manhole and not throngh white insnection pipes <br /> Thts alloK•s for the orooer cleanin¢. <br /> . 7 Inspecrion risers missing-tanks could not be inspected. Inspection risers(4"dia.pipe)must be itistalled in each tank: <br /> �INFIELD CONDITION t 8-1Q): � <br /> Dra.infield'u dry,no surfacing evident <br /> 9 Some evidence of surfacing,aot critical ye� • <br /> 10 Drainfield'u saturated and visibly dischacging untreated effluent to the surface. Contact the Ciry Inspector � � <br /> immediately.Repairs must be completed within 90 days. . , <br /> coM�rr�rs: �c,��� G�� sz �-� �-����..5 I �o� nc�, <br /> ���� S�P �-,L �--e.�1�5 r�c'�er S u,,,.r^Z r . <br /> � - ��-�� �� �,�„�,,� <br /> Date of Inspection Matt Bolterman- Sepac Syatem Inspoctor <br /> Note:In the event that thts inspection report Is used W satisfy the rcquiremrntt for a mortgage o�otha transfer of properry.be advised that this report doa noc guaranue <br /> or artity tfiat an existing systan wilt continue w functlon propedy,but Is menly an op'uuoa ofthe adcquary o[the sysum uader earrent conditions based on d�e avu'lable <br /> infocmation. . <br />