r <br /> , CITY OF ORONO <br /> GENERAL CONSTRIICTION REQUIR�iTS <br /> MOUND DRAINFIE�D SYSTIIK <br /> TO BE USED WHERE: Seasonal perched water table is between 2 feet and 4 feet <br /> below surface. Percolation rate in top 12" of soil is <br /> faster than 60 MPI. Percolation rate in subsoil but above <br /> water table is faster than 120 MPI. Where percolation rate <br /> is 60-120 MPI, depth t� groundwater shall be at least 3� <br /> and slope must be no more than 3�. Where percolation rate <br /> is 30-60 MPI, depth to groundwater shall be at least 2t <br /> and slope mus� not exceed b�. If percolation rate is faster <br /> than 30 MPI, depth to groundwater shall be at least 3t and ^ <br /> slope must not exceed 6-12�. <br /> CONNECTION TO <br /> HOIISE � : House to tanks may be PVC (ASTM D-3034 or better) , <br /> cast iron or clay tile . PVC should be sand-bedded <br /> in flat runs over long distances . No outside air test <br /> required but joints must be tight . <br /> TANKS : Two (2) precast concrete tanks are required. Min. size <br /> 1000 gal. and 750 �al . ; we recommend 2 1000� s . Tanks <br /> must have 20" manhole riser to within 12" of final <br /> grade, and at least one !}"-6" inspection stack to � <br /> surface . Baffles must be acid resistant and ma� be <br /> plastic , fiberglass, or precast with tank. <br /> DRAINFIELD . Mound consisting of 12-2L�" layer of sand on plowed, chopped, <br /> or otherwise scarified natural surface soil . 12" �ock bed <br /> on top of sand layer, 10 � maximum width X len�th dependent <br /> on water use. Distribution pipe is laid in top 3" of rock. <br /> Cover rock bed with straw or hay AND building paper. A <br /> layer of sandy loam 6-12" thick should be placed over the <br /> covered rock bed and a 6" layer of topsoil then placed over <br /> the entire mound. Finished sidesYopes to be 3 :1 or flatter. <br /> Grass cover should be established as soon as possible over <br /> the mound area to reduce erosion and aid in evaporation. <br /> THE MOST IlKPORTANT STEP IN CONSTRIICTING A MOUND IS <br /> PREPARING THE NATURAL SOIL SURFACE BY DISC-PLOWING <br /> OR CHOPPING WITH A BACKHOE TO A DEPTH OF ABOUT '12" . <br /> When sand is pushed or dropped onto this loosened raw top- <br /> soil (DON�T drive on it) , an interface is formed which will <br /> allow percolation to occur from the sand into the topsoil . <br /> SEE SKETCH ON BACK OF THIS SHEET. <br /> DISTRIBUTION : ; The mound must use pressure distribution and requires a • <br /> pump from the se�tic tanks . Distribution must be 1 �" PVC <br /> or plastic with 4" holes (turned down) every 36" . Pumping <br /> from a 2" manifold, distribution system ahould be 3 lengths <br /> of pipe spaced 40" on center capped at i�he ends, runnin� <br /> the len�th of the rock bed (see sketch) . No drop boxes or <br /> distribution boxes are used. L�." PIPE WITH GRAVITY DISTRIB- <br /> UTION IS NOT ACCEPTABLE IN A MOUND SYSTE�I. <br />