My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Terrace
>
1830 Lakeview Terrace - 27-118-23-42-0011
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:22:09 PM
Creation date
4/25/2017 12:47:45 PM
Metadata
Fields
Template:
x Address Old
House Number
1830
Street Name
Lakeview
Street Type
Terrace
Address
1830 Lakeview Terrace
Document Type
Septic
PIN
2711823420011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. r ' � <br /> , . '' ' <br /> � • , �� <br /> S-P TE S TING, INC. � <br /> 951 KATYDID LANE. ' <br /> ST. MICHAEL, MN 65376 <br /> 497-3566 <br /> , Steven B. Schirmers_ . <br /> May 29, 1991 <br /> Dale Pfeilsticker � � <br /> OP� . . <br /> �� <br /> 1830 Lakeview Terrace � <br /> .� <br /> Orono, Henn. Co. , MN . <br /> This On-Site ,Sewage Treatment System is �esigned for a Type l, three <br /> bedroom home in accordance with the Minnesota Pollution Control <br /> Agency Chapter:7080 and local ordinances. _ _. <br /> The soils on this site site are typic�l of SCS soils mapped - HbB - . <br /> Hayden loam bordered by - ErB2 - Erin clay loam. A seasonally hiqh <br /> water table was located at 18" , 20" & 26" , (mottled soil) . Due to . <br /> the seasonally high water table, a Pressurized Mound System will need <br /> to be installed. The bottom of the rock bed must be located at least <br /> 3 ' above the seasonally high water tahle. . . <br /> The soils at a depth of 12" have a percolation rate averaging 8.7 <br /> min/inch and are adequate for treating septic effluent. . • <br /> A pumping chamber will need to be installed to lift the effluent to the . <br /> treatment. area. ' � <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber.. The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are clean. The sod layer below the '. <br /> entire mounded area must be turned over, just break up the sod, be sure <br /> �. not to over work. � <br /> The power supply and switches must be located outside� the manhole and <br /> pumping chamber in a weather proof enclosure. A warning device must be <br /> installed .with a liqht and sound device, this is in case of a pump failure. <br /> (Mercury floats are a good method) . <br /> This site has an existing failing system due to high water table, <br /> strong clay soils & .fill soil . Over the winter of 1990-91, the <br /> system was surface �discharging. This spring the system was no <br /> longer surfacing. A boring into the rock indiated effluent 12" over <br /> the rock, this is a sign of• system failure. � <br /> � . <br /> CONT'D <br /> So�t and Percolatlon Teiti <br /> Septic Syste�n De�ign <br />
The URL can be used to link to this page
Your browser does not support the video tag.