My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info including design
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Terrace
>
1810 Lakeview Terrace - 27-118-23-43-0005/8
>
Septic
>
septic info including design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:22:28 PM
Creation date
4/25/2017 11:56:37 AM
Metadata
Fields
Template:
x Address Old
House Number
1810
Street Name
Lakeview
Street Type
Terrace
Address
1810 Lakeview Terrace
Document Type
Septic
PIN
2711823430005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�: IX}WNSLOPE DIKE WIDTH <br /> 1. If landslope is 3% or more,subtract rock layer width from <br /> adsorption width to obtain minimum downslope dike toe for <br /> absorption: " <br /> �L''1 ft-�ft=�'�feet � � , <br /> 2. Calculate minimum mound size based on geometery: <br /> a. Determine depth of clean sand fill at upslope edge of rock <br /> layer: Separation l.c� feet <br /> b. Multiply rock layer width by landslope to determine drop ,�,r„�; :, . <br /> in elevation;Slope Dif f'erence ��:•.� <br /> ;: <br /> /v x�l _%+ 100 =_�feet ' W�-�- <br /> c. Add depth of clean sand depth of clean sand for � � ��-��- <br /> separation at upslope edge (2a) to depth of rock layer to �� '" <br /> rock depth and the depth of cover to find the total mound �`d'�__ <br /> height at upslope edge of rock layer; <br /> /. o ft + 1 ft + 1 ft = 3.U feet <br /> d. Enter table on page bottom with landslope and upslope <br /> dike ratio. Select dike multiplier of 'z>.'�� <br /> e. Multiply dike multiplier by upslope mound height <br /> to get upslope dike width: 3.D x 3•a� =1�feet <br /> f. Add the depth of slope difference(2b) to the upslope <br /> height to get the downslope height <br /> 3• D + �= 3,c� feet <br /> g. Enter table on page bottom with landslope and � <br /> downslope dike ratio. � <br /> Select dike multiplier of 5,�,C. <br /> h. Multiply dike multiplier by downslope mound height � <br /> to get downslope dike width: 3,r� x .S�� _��feet <br /> i. Compare the values of step G.1 and Step G.2.h. Select the � <br /> greater of the two values as the downslope dike width; . <br /> /q feet <br /> j. Total mound width is the sum of upslope dike �eea w��;Jo�:.'`� �'U��w��-1�"`�::.::.: <br /> width plus rock layer width plus downslope '''�'` �:�`.•�:�::�::� <br /> dike width; ;l::: �'8 ''•�``�`'` <br /> _�ft +�_ft + rz ft= �Lfeet u�,o�'o�rvidi�_j5:�:'• ��� � �� �� .�.�� <br /> :.ti ��widii; <br /> k. Total mound len th is the sum of u slo e <br /> S P P . <br /> dike width lus rock la er len th lus � r'°"�'°�.�"�.W'a`�':��'" <br /> P Y g P <br /> u slo e dike width• <br /> P P � <br /> /o ft+��ft+ /v ft= �feet � �T�,,�„gw �� <br /> / '� + 55 + 1 �3 r <br /> 3:1 kl 5•imS� &1 7:1 ! 3:1 kl SS� &1 7:1 8:1 <br /> 9L slope <br /> 0 3A d.0 5.0 GO 7.0 3.0 4.0 5.0 GO 7.0 8.0 <br /> 1 3.09 4.17 5.26 638 753 2.91 3.85 d.76 5.66 G54 7A1 ---- <br /> 2 3.19 4.35 556 6.ffi 8.14 283 3.70 �.5{ 536 6.14 6.90 <br /> 3 330 45{ 5.88 7.32 8.86 275 3S7 d.35 5.06 5.79 6.6 <br /> � 3A1 4.76 6.25 7.89 9.T1 268 3.1i 4.17 1.81 5.46 6.06 <br /> 5 353 5.00 G67 8S7 10.77 2.61 3.33 4.00 4.62 S.19 5.71 <br /> 6 3I,6 _�.$'> 7.16 9.38 12.07 2S4 � 3.85 1.11 4.93 5.41 <br /> 7 3.80 556 7.69 1034 13.73 248 :12 3.70 �.Yi 4.70 5.13 ) <br /> 8 3.% 5.88 8.33 1154 15.91 242 3.Q'i 3.57 {.QS d.69 4.86 � <br /> 9 4.11 6.75 9.09 73.04 18.92 2.36 2.% 3.45 3.90 d.30 4bS <br /> 10 129 G67 10A 15A0 2333 2.31 2.86 3.33 3.75 4.12 �A4 <br /> 11 4A8 7.14 Il.11 17.65 30A3 2.26 278 3.73 3.61 3.95 �26 <br /> 12 4b9 7.b➢ 1750 21A3 43.75 2.21 Z70 3.72 3.�9 3.80 4.06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.