My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01236 - new structure
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
795 Lakeview Parkway - 06-117-23-43-0014
>
Permits/Inspections
>
2015-01236 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:28:59 PM
Creation date
4/24/2017 3:02:26 PM
Metadata
Fields
Template:
x Address Old
House Number
795
Street Name
Lakeview
Street Type
Parkway
Address
795 Lakeview Pkwy
Document Type
Permits/Inspections
PIN
0611723430014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEII�ED <br /> �Voigt & Associates, Inc. SEP 2 3 2015 <br /> ' STRUCTURAL ENGINEERING SERVICES <br /> 4635 NICOLS RD. SUITE 204 (;f.�,Y Q���ON� <br /> EAGAN,MN 55122 <br /> � PH.(651)686-7727 FAX.(651)686-8444 <br /> Michael Karn � September 3,2015 <br /> Gonyea Homes ����� ���� <br /> 6102 Olson Memorial Highway <br /> Golden Valley,MN 55422 <br /> 763-432-4511 <br /> michael @�onyeacompanies.com <br /> RE:Lakeview Model at a�x Lakeview Parkwav,Orono,MN <br /> Dear Mr. Karn: <br /> Per your request,I examined the main level garage wall(front elevation)of the address above for compliance with the 2015 <br /> Minnesota State Building Code(2012 IRC w/Minnesota amendments)bracing requirements. Your plan notes that you will <br /> be sheathing the entire exterior of the building with OSB pernutting the use of Table R602.10.4 Continuous <br /> Sheathing Methods,CS-WSP and PFH. Please note IRC Figure R602.10.8(1)Braced Wall Panel ...to Floor/Ceiling <br /> Framing connection requirements for the continuous method. <br /> The attached sheet,BP1,indicates the locations of braced wall segments for the front elevation of the garage on the main <br /> level of this house and the location of portal frames. See Details S1,S2 and S3. <br /> You asked that I comment on the taii wall at the stairwell. Please see Detail T1. <br /> You also asked that I review the tall wall at the sport court.Frame these walls with(2)2X6s#2 SPF @ 12"centers. <br /> A basic assumption of IRC bracing is that the rest of the structure is properly constructed and connected per the appropriate <br /> section of the code. <br /> The information and opinions contained herein are based upon the limited investigation described at the beginning of this <br /> report.No warranties are expressed or implied regarding the existence of other unknown conditions not specificaliy <br /> addressed.Our work is in accordance with generally accepted engineering standards and is not intended to be relied upon or <br /> transferred to individuals other than the addressee. Should information or conditions become known which differ from the <br /> discussion herein,they may aiter the opinions ar conclusions of the undersigned. <br /> Please call if you have any questions. <br /> Sincerely, � <br /> P�. w� � . <br /> � <br /> I Hereby Certify That This Plan,Specification,Or Report Was Prepared <br /> By Me Or Under My Direct Supervision And That I Am A Duly <br /> Licensed Engineer Under The Laws Of The State Of Minnesota. <br /> Paul W.Voigt Date 9/3/15 License Number 20705 <br />
The URL can be used to link to this page
Your browser does not support the video tag.