|
Rhvac-Residential&Light Commercial H1/AC Loads �lite Software Developme�t,Inc.
<br /> Sabre Plumqing&Heating � XXXX Lakeview Parkway Orona LAK�VIEW MODEL'
<br /> P outh MN 55447 Pa e 3
<br /> Load Preview Re ort
<br /> Net ft. Sen Lat Net Sen Ht CI Act ��
<br /> , Sys Sys Sys
<br /> Scope Ton /Ton Area Gain Gain Gain Loss 9 9 Size
<br /> __ CFM CFM_CFM
<br /> Building 3.85 1,236 4,763 38,691 7,537 46,228 71,220 853 1,748 1,748
<br /> System 1 3.85 1,236 4,763 38,691 7,537 46,228 71,220 853 1,748 1,748 14x20
<br /> Ventilation 1,298 5,221 6,519 7,057
<br /> Supply Duct Latent 146 146
<br /> Retum Duct 80 69 149 432
<br /> Humidrfication 7,181
<br /> Zone 1-Clg.:20%,Htg.:25% 1,406 8,949 0 8,949 14,102 213 419 419 9x9
<br /> 1-Basement 1,406 8,949 0 8,949 14,102 213 419 419 4-6
<br /> Zone 2-Cip.:6%,Htq.:17% 450 2,530 0 2,530 9,668 146 119 119 5x5
<br /> 2-Sport Court 450 2,530 0 2,530 9,688 146 119 119 2-4
<br /> Zone3-CIg.:49%,Htg.:32% 1,418 21,462 2,101 23,563 17,882 270 1,005 1,005 12x15
<br /> 3-Main Floor 1,418 21,462 2,101 23,563 17,882 270 1,005 1,005 10--6
<br /> Zone 4-Clg.:25%,Htg.:26% 1,489 11,022 0 11,022 14,900 225 516 516 9x12
<br /> 4-Second Floor 1,489 11,022 0 11,022 14,900 225 516 516 5-6
<br /> Sum of room airflows may be greater than system airflow because
<br /> s stem has multiple zones.
<br /> M:\...WOCX Lakeview Parkway Orono LAKEVIEW MODEL.rh9 Monday,August 31,2015,8:11 AM
<br />
|