My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01328 - septic
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
795 Lakeview Parkway - 06-117-23-43-0014
>
Septic
>
2015-01328 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:29:00 PM
Creation date
4/24/2017 3:02:09 PM
Metadata
Fields
Template:
x Address Old
House Number
795
Street Name
Lakeview
Street Type
Parkway
Address
795 Lakeview Pkwy
Document Type
Septic
PIN
0611723430014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Basic Pump Setection Design <br /> Minnesota Pollution Worksheet UNIVERSITY <br /> Control Agency OF MINNESOTA �1,.�" <br /> t. PUMP CAPACITY Project ID: <br /> Pumping to Gravity or Pressure Distribution: Q Graviry QQ Pressure Selection requlred <br /> 1. If pumping to gravity enter the gallon per minute of the pump: ��GPM (f0-45 3P►n) <br /> 2. If pumping to a pressurized distribution system: 36.0 GPM <br /> 3. Enter pump description: <br /> 2. HEAD RE UIREMENTS s ` <br /> Q point of discMrye <br /> � . <br /> A. Elevation Difference 20 ft <br /> between pump and point of discharge: <br /> S�H K� <br /> ���� Elwatlon%�• <br /> B. Distnbution Head Loss: �ft -- . - a�nenn�e <br /> C. Additional Head Loss: ��ft(due to special equipment,eu.) ----------------------------- -------------• <br /> Tabie I.Friction Loss in Plastic Pi r 100ft <br /> Distribution Head Loss <br /> Gravity Distribution = Oft FIOw Rdte P� Diameter Iinches► <br /> (GPM) i 1.25 1.5 2 <br /> Pressure Distribution based on Minimum Average Head 10 9.1 3.1 1.3 0.3 <br /> Value on Pressure Distribution Worksheet: �2 �Z,g 4.3 1.8 0.4 <br /> Minimum Avera e Head Distribution Head L.oss �4 17.0 5.7 2.4 0.6 <br /> ift 5ft �6 Z�,g 7.3 3.0 0.7 <br /> 2ft 6ft 18 9.1 3.8 0.9 <br /> 5ft 10ft 20 ��,� 4.6 1.1 <br /> 25 16.8 6.9 1.7 <br /> D. 1. Supply Pipe Diameter; 2.0 in 30 23.5 9.7 2.4 <br /> 35 12.9 3.2 <br /> 2.Supply Pipe Length: 95 ft qQ 16.5 4.1 <br /> E. Friction Loss in F[astic Pipe per 100ft from Table I: 45 20.5 5.0 <br /> 50 6.1 <br /> Friction Loss= 3.32 ft per 100ft of pipe 55 7.3 <br /> 60 8.6 <br /> F, Determine Equivalent Pipe Length from pump discharge to soil dispersal area discharge 65 10.0 <br /> point. Estimate oy adding 25%to supply pipe length for fitting loss. Suppty Pipe Length �� 11.4 <br /> (D.2) X 1.25=Epuiva(ent Pipe Length 75 13.0 <br /> 95 ft X 1.25 = 118.8 ft 85 16.4 <br /> 95 20.1 <br /> G. Calculate Supp(y Friction loss by multiplying Friction Loss Per 100ft (Line E)by the Equivalent Pipe Length (Line F)and divide by 100. <br /> Supply Fnction Loss= <br /> 3.32 �ft per 100ft X 118.8 ft + 100 = 3.9 ft <br /> H• Toto!Heod requirement is the sum of the Elevation Difference (Line A),the Distribution Head Loss(Line B),Additional Head Loss(Line C),and <br /> the Supply Fnction Loss(Line G ) <br /> 20.0 jft + 5.0 ft + �ft + 3.9 ft = 28.9 ft <br /> 3. PUMP SELECTION <br /> A pump must be selected to deliver at least 36.� GPM(Line 1 or Line 2)with at least 28�9 feet of total head. <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.