My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01328 - septic
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
795 Lakeview Parkway - 06-117-23-43-0014
>
Septic
>
2015-01328 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:29:00 PM
Creation date
4/24/2017 3:02:09 PM
Metadata
Fields
Template:
x Address Old
House Number
795
Street Name
Lakeview
Street Type
Parkway
Address
795 Lakeview Pkwy
Document Type
Septic
PIN
0611723430014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.s. OSTP Basic Pump Selection Design <br /> Minnesota Pollution Worksheet UNIVERSITY <br /> Control A enc OF MINNESOTA '�-��L�"' <br /> 1. PUMP CAPACITY Project ID: <br /> Pumping to Gravity or Pressure Distribution: Q crawry QQ Pressure Selection required <br /> 1. If pumping to gravity enter the gallon per minute of the pump: �GPM (10-45 Spm7 <br /> 2. If pumping to a pressurized distribution system: 36.0 GPM <br /> 3. Enter pump description: <br /> 2. HEAD REQUIREMENT$ aomncot'e�sceysiy°e <br /> .a • <br /> A. Elevation Difference 14 ft �`��\8�" <br /> between pump and point of dfscharge: <br /> n�ec wve <br /> B. Distribution Head Loss: ��ft ' _ en�°e': <br /> C. Addittondl Hedd Loss: �ft ldue to spectalequipment�etc.) ------•----------------•----. ...-------.... <br /> Table I.Frlction Loss in Piastic Pipe per 100ft <br /> Disttibution Head Loss <br /> Gravlty Distrlbution = Oft <br /> Flow Rate Pi Diameter(inches) <br /> IGPM1 1 1.25 1.5 2 <br /> Pressure Distribution based on Minimum Average Head 10 9.1 3.1 1.3 0.3 <br /> Value on Pressure Distribution Worksheet: �2 �2,g 4.3 1.8 0.4 <br /> Mlnimum Avera e Head Distributlon Head Loss 14 17.0 5.7 2.4 0.6 <br /> 1ft 5ft �6 2�,$ 7.3 3.0 0.7 <br /> 2ft 6ft 18 9.1 3.8 0.9 <br /> 5ft 1 Oft �p 11.1 4.6 1.1 <br /> 25 16.8 6.9 1.7 <br /> D. 1.Supply Pipe Diameter: 2.0 in 30 23.5 9.7 2.4 <br /> 35 12.9 3.2 <br /> 2.Supply Pipe Length: 95 ft 4p 16.5 4.1 <br /> E. FHction Loss in Plastic Pipe per 100ft from Table I: 45 20.5 5.0 <br /> 50 6.1 <br /> friction Loss= 3.32 ft per 100ft of pipe 55 7.3 <br /> 60 8.6 <br /> p, Determine Equivnlent Pipe Length from pump discharge to soil dispersal area discharge 65 10.0 <br /> point. Estimate by adding 25%to supply pipe length for fitting loss. Suppl y Pipe Length �� ��.4 <br /> (D.2) X 1.25=Equivo(ent Pipe Length 7g 13.0 <br /> 95 ft X 1.25 = 118.8 ft 85 16.4 <br /> 95 20.1 <br /> G. Calculate Supp(y Friction Loss by multiplying Friction Loss Per f00ft (Line E)by the Equivalent Pipe Length (Line F)and divide by 100. <br /> Supply Friction Loss= <br /> 3.32 ft per 100ft X 118.8 ft + 100 = 3.9 ft <br /> H• Total Head requirement is the sum of the Elevation Difference (Line A),the Distribution Head Loss(Line B),Additional Head Loss(Line C),and <br /> the Supply Friction Loss(Line G ) <br /> 14.0 ft + 5.0 ft + ��ft + 3.9 ft = 22.9 ft <br /> 3. PUMP SELECTION <br /> A pump must be selected to deliver at least 36.0 GPM(Line 1 or Line 2)with at least 22�9 feet of total head. <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.