My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01328 - septic
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
795 Lakeview Parkway - 06-117-23-43-0014
>
Septic
>
2015-01328 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:29:00 PM
Creation date
4/24/2017 3:02:09 PM
Metadata
Fields
Template:
x Address Old
House Number
795
Street Name
Lakeview
Street Type
Parkway
Address
795 Lakeview Pkwy
Document Type
Septic
PIN
0611723430014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersal Media: <br /> B. Enter the Component: Length: ��ft Width:��ft Depth:�ft <br /> C. Number of Components per Row= Bed Length divided by Component Length (Round up) <br /> �� ft :- � ft= �components/row <br /> D, Actual Bed Length = Number of Components/row X Component Length: <br /> ��components X ��ft = ��ft <br /> E. Number of Rows=Bed Width divided by Component Width (Round up) <br /> � ft= C� ft= � rows Adfust w�dth so this 1s an whole number. <br /> F. Total Number of Components= Number of Components per Row X Number of Rows <br /> �� X �� _ �components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Clean Sand Lift <br /> 3.0 ft - 2.2 ft = 1.0 ft Design Sand Lift (optional): �ft <br /> 6. Calculate Upslope Height: Clean Sand Lift + media depth +cover(1 ft.) = Upslope Height <br /> 1.0 ft + 0.5 ft + 1.0 ft= 2.5 ft <br /> C. Select Upslope Berm Multiplier (based on land slope): 3.57 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Calculate Upslope Berm Width: Multiplier X Upslope Mound Height = Upslope Berm Width <br /> 3.57 ft X 2.5 ft = 9.0 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Slope + 100= Drop (ft) <br /> 10.0 ft X 9.0 % = 100= 0.90 ft <br /> F. Calculate Downslope Mound Height: Upslope Height+ Drop in Elevation = Downslope Height <br /> 2.5 ft + 0.90 ft = 3.4 ft <br /> G. Select Downslope Berm Multiplier (based on land slope): 6.25 <br /> land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Downslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratfo 4:1 4.00 4.17 4.35 4.54 4.76 5.� 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Calculate Downslope Berm Width: Multiplier X Downslope Height = Downslope Berm Width <br /> 6.25 x 3.4 ft = 22.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width +4 feet <br /> 16.0 ft +r 4 -,ft = 20.0 ft <br /> �__J <br /> J. Design Downslope Berm =greater of 4H and 41: 22.0 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usua!(y 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Mound Height = Endslope Berm Width <br /> 3.00 ft X 3.4 ft = 11.0 ft <br /> M. Calculate Mound Width: Upslope Berm Width + Bed Width + Downslope Berm Width <br /> 9.0 ft + 10.0 ft + 22.0 ft = 41.0 ft <br /> N. Calculate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> 11.0 ft + 63.0 ft + 11.0 ft = 85.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.