My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design - general approval-final design with bldg permit
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Court
>
4325 Lakeview Court - 06-117-23-43-0016
>
Septic
>
septic design - general approval-final design with bldg permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:29:05 PM
Creation date
4/19/2017 10:37:02 AM
Metadata
Fields
Template:
x Address Old
House Number
4325
Street Name
Lakeview
Street Type
Court
Address
4325 Lakeview Ct
Document Type
Septic
PIN
0611723430016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 5. QISTRiBUTION MEQ1A. REG[51'�RED TREATMENT FRODUCTS: CHAMBERSANE3 62FL�W <br /> A. Enter Qispersal Media; <br /> B, Enter the Component Length: �ft �nter the Component Width: �ft <br /> C. Number af Components per Row= Bed tength divided by Cornponent Length {Round up) <br /> t__.._J f t = � f t = ��camponents/row <br /> D. Actual Bed Length =Number of Camp�nents/raw X Component Len�th. <br /> ��companents X �r__�ft = ��ft <br /> E. Nurr�ber of Rows= Bed Width divided by Component Width (Round up} <br /> � f t ' [.� ft= �� rows Adjust widlh so this�s an whate number. <br /> F. Totat Number of Components= Number of Components per Row X Number of f2ows <br /> �___� X E_�� - �i�components <br /> 6. M�UND SIZtNG <br /> A. Caleutate Minimum Clean Sand Lift: 3 feet minus�epth ta Limiting Condition =Ctean 5and Lift <br /> 3•� ft • 1•2 ft = 1.8 ft Design Sand Lift(optional): ��ft <br /> B. Cakulate Upstope I�ei�#�t: Ctean Sand Lift +media depth +cover(1 ft.� = Upstope� Heigttt <br /> 1•8 ft + 0.5 ft * 1.0 ft= 3.3 ft <br /> C. Setect Upslope Berm Multiptier(based an land slope}: 3.45 <br /> Land Slope 96 0 1 2 '' 3 �► 5 6 7 8 9 It} 11 22 <br /> Upslope Berr» 3:1 3.E?0 2.91 2.83 Z.75 2.68 Z.61 �,54 2,�g 2.42 2.36 2.31 2.26 2.22 <br /> Rat'ro 4:1 4.00 3,$S ���tt 3.5? 3'.4� 3.3� 3.23 3.12 3_03 2.94 �.f36 �.78 �.70 <br /> D. Catcutate Upstope Berm Width: Multiplier X Upstape N�und Height =Upsfnpe Berrn Width <br /> 3.45 ft X 3.3 ft = 12.(} ft <br /> E. Calcutate Clrap in Elevation Under Bed: Bed Width X Land Stape � 1fXt=[lrop (ft) <br /> �0.0 ft X 6.0 � : t00= 0.64 ft <br /> F. Calcutate Qawnsiope Mound Height: Upslope Height+ prop in Etevation = Downslope Height <br /> 3.3 ft + 0.60 �t = 3.9 ft <br /> G. Setect t3ownstope Berm Multiplier(based on land stape): 5.26 <br /> Land 5lo�e% Q ; 1 2 3 ' 4 5 fr 7< 8 9 It} Ii 12 <br /> Dnwnslope 3:2 3.d0 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratia 4.� 4.t7�f 4.2�" 4.35 �t,�4 4.76 S.flO 5.26 5.*�G 5.88 6a2S 6.67 7.14 7.69 <br /> H. Ca[cutate Downstape Berm Width: Muttiptier X Dowr�sEape Neight =aownsiope Berm Wid�h <br /> 5.�� x 3.9 fC = 2Q.7 ft <br /> I. Catculate Minimum Berm to Cover Absorption Qrea: Downslope Absarption Width + 4�e�t <br /> 16.t1 ft +C 4�ft = 20.0 ft <br /> J. Design Downstope Berm =�reater af 4Fi and 41: 21.0 ft <br /> K. Setett Endstope Berm Multipiier: 3.00 {u�ual(y 3.t1 ar 4:0) <br /> L. Calculate Endslope Berm X pownslope Mound Height = �ndslope Berm tiNidth <br /> 3.£�7 ft X 3.9 ft = 12.0 ft <br /> M. Catculate Maund Width: Upstope Berm Widt(�+ Bed Width+ E?ownstope Berm Width <br /> 'l2.0 ft + 1d.0 ft + 21.0 ft = 43.d it <br /> N. Catcutate Mound Length: Endslope Berm Width + Bed Len�th + Endslope Berm Width <br /> 12.� ft + 38.0 ft + 12.0 ft = 62.d it <br />
The URL can be used to link to this page
Your browser does not support the video tag.