My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P05752 - new septic system
Orono
>
Property Files
>
Street Address
>
K
>
Kokesh Farm Road
>
575 Kokesh Farm Road - 31-118-23-11-0011
>
Septic
>
2002-P05752 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:28:35 PM
Creation date
4/17/2017 2:22:42 PM
Metadata
Fields
Template:
x Address Old
House Number
575
Street Name
Kokesh Farm
Street Type
Road
Address
575 Kokesh Farm Road
Document Type
Septic
PIN
3111823110011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED SITE EVALUATION REPORT for Lot 2,Block 1,Kokesh Farm <br /> Sewage Treatment System Page 4 <br /> Sandy loam soil shall be placed on the filter�terial to a depth of 12 inches in the center of the mound and <br /> to a depth of 6 inches at the sides. <br /> Six inches of topsoil shall be placed on the fill material over the entire area of the mound. A grass cover <br /> shall be established over the entire area of the mound. No shrubs shall be planted on the top of the mound. <br /> Shrubs may be placed at the foot and side slopes of the mound. <br /> The side slopes of the mound will be 4 feet horizontal to 1 foot vertical(4:1). This gentle slope will allow <br /> easy mowing of the gass cover. The soil material at the toe of the dike should be slightly less permeable <br /> or som�what tighter than the na.tural soil below the mound. This can be accomplished by selecting a finer <br /> soil or by compaction. <br /> Whenever mounds are located on slopes, a diversion shall be constructed immediately up slope from the <br /> mound to intercept and divert runoff. <br /> PIJMP AND COLLECTION TANK: <br /> A pump shall be used to deliver effluent to the mound. The pump shall be cast iron or bronze fitted with <br /> stainless steel screws or constructed of other sound, durable and corrosion resistant materials. <br /> The pump installed will need to deliver 66.6 gallons per minute with a head of at least 20 feet. An alazm <br /> device shall be installed to warn of pump failure. Install the pump control and a Meyers, Model D.L.V. <br /> Audio Visual, Lo-Voltage alarm system or approved equal in a conspicuous place at the direction of the <br /> owner. <br /> Dosing Volume=25% of 750 g.p.d. = 188 gallons. <br /> DRAINFIELD ROCK REOUIRED: <br /> Based on 12 inches of rock,27.8 cubic yards of rock would be required. <br /> SAND REOUIRED: <br /> Approximately 350 cubic yards of clean sand for under mound is needed. <br /> TE • <br /> A. Please see site plan layout. <br /> B. Typical sections for construction follow. <br /> C-7 E-3 E-4 E-6 E-12 F-7 <br /> PROPOSED ELEVATIONS: <br /> Top Foundation = 1043.0 <br /> Basement Floor = 1035.0 <br /> Top of 1"` Septic Tank = 1014.0 <br /> Top Of 2na SeptiC Tank = 1011.0 <br /> Top of Pump Tank = 1002.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.