Laserfiche WebLink
REVISED SITE EVALUATION REPORT for Lot 2,B1ock 1,Kokesh Farm <br /> Sewage Treatment System page 2 <br /> GENERAI�INFORMATION <br /> This design is for a Type 1, 5 bedroom home and in accordance with the Minnesota.Pollution Control <br /> Agency Standards and local ordinances. <br /> A seasonally lugh water table was evidenced at 12 inches of depth in Soil Boring 4. The slope is about <br /> 10%. <br /> The soils at a depth of 12 inches in Test Hole 4 and has a percolation rate of 7 minutes per inch. All <br /> neighboring wells are located more than 100 feet away from the proposed treatment area. <br /> 1�IOTES: <br /> Keep a11 heavy equipment off the proposed treatment a.rea before and after construction as much as <br /> possible. The treatment area should be marked offbefore construction. <br /> With proper installation and m�intenance this system should have no problem in treating septic ef�luent <br /> effectively. <br /> It is recommended that the septic tanks be pumped every 2 years. <br /> MOUND SYSTEM: <br /> Flow: 5 bedroom= 150 gallon/day/bedroom 150 x 5 =750 gallons per day. <br /> 750 GPD x 1.00= 750 square feet. <br /> 10 foot wide rock bed 75 feet long= 750 square feet <br /> CONSTRUCTION EOUIPMENT: <br /> A rubber-tired tractor may be used for plowing or disking to prepaze the soil surface but in no case shall <br /> a rubber-tired tractor be used after the surface preparation is completed. A crawler or tract-type tractor <br /> shall be used for mound consriuction. <br /> � SOIL SURFACE PREPARATION: <br /> The discharge pipe from the pump to the mound area shall be installed prior to soil surface preparation. <br /> The trench excavated to install the discharge pipe shall be carefully backfilled and compacted to prevent <br /> seepage of effluent. <br /> The total area selected for the mound, including that under the dikes, sha11 be roughened in order to <br /> thoroughly break up any existing sod layers and to provide a suitable transition zone between the original <br /> soil and sand layer of the mound. The area sha11 be roughened only when the moisture content of the soil <br /> 8 inches below the surface is drier than the plastic limit. <br /> Surface preparation or roughening may be performed with a mold board plow, a disk plow, or a back hoe <br /> using only the tceth Mold board plow fun-ows shall be at least 8 inches deep, shall be thrown up slope and <br /> sha11 run perpendicular to the slope. There shall be no dead fiurow under the mound. <br />