Laserfiche WebLink
STTE EVALUATION REPORT <br /> For Brian and Nancy Siska <br /> Sewage Treatment System Page- 3 <br /> Disking may be used for surface preparation as a subsritute for mold board plowing in soils having <br /> percolation ra.tes faster than 15 minutes per inch(sandy loam)in the top 8 inch depth. <br /> Back hoe teeth may be used to roughen the soil surface and break up the sod layer. Care must be taken <br /> so as to not compact or puddle deeper soil layers. In no case shall any surface soil be excavated and <br /> removed from the area. <br /> Mound construction shall proceed immediately after surface preparation is completed. Every effort <br /> should be taken to prevent ra.in from falling on the prepared soil surfa.ce, <br /> ONSTR TI N MATERIAL A1VD p ED S: DISTRIB ON F EFFL <br /> A minimum of 12 inches of soil defined as sand shall be piaced where the filter material is to be located. <br /> A crawler tractor with a blade or bucket shall be used to move the sand into place. At least 6 inches of <br /> sand shall be kept under the tracks to minim»e compacting of the plowed layer. The sand layer upon <br /> which the filter material is placed shall be level. <br /> Sand is defined as a soil texture composed by weight of at least 25 percent of very coarse and medium <br /> same, varying in size from 2.0 to 0.25 mm, less than 50 percent of fine or very fine sand rang�ng in size <br /> between 0.25 and 0.05 mm, and no more than 10 percent of particles smaller than 0.05 mm. <br /> A minimum depth of 9 inches of filter material(rock) shall be placed on the sand layer prior to installing <br /> the distn'bution pipe. <br /> Filter material is defined as clean rock, crushed igneous rock or similar insoluble, durable and decay- <br /> resistam material free from dust, sand, silt or clay. The size shall range from 3/4 inch diameter to 2 �h <br /> inch diarnetter. <br /> PRESSURE DISTRIBUTION: <br /> Effluern shall be distributed over the filter material by three 1-1/2 ineh diameter perforated pipes under <br /> pressure 72.5 feet Iong. Perforation holes shall be 1/4 inch diameter drilled in a straight line along the <br /> length of the pipe. Hole spacing shall be 30 inches with 30 perforation per lateral. Holes shall be drilled <br /> straight urto the pipe and not at an angle. A sharp drill s,hall be used and any bwrs in the inside of the <br /> pipe shall be removed. The perforated pipe laterals shall be installed level with the perforations <br /> downward. - <br /> The perforated pipe laterals shall be connected to a 2 inch diameter mazufold pipe and shall have their <br /> ends capped. The laterals sball be spaced 40 inches on center and at 20 inches from the edge of the filter <br /> material. � <br /> The manifold pipe shall be connected to the supply pipe from the pump. The manifold shall be sloped <br /> towazd the supply pipe from the pipe. <br /> Geo-textile material shall be placed over the filter material. <br />