Laserfiche WebLink
, .. <br /> Site Evaluation Reporf-Sharr-att Design &Gompany Page 3 <br /> .'' �tto Job No. �5-0490 November 17, 2C?�5 <br /> CONSTRUCTI4N MATERIAI�S AND PR�CEDURES: DISTRIBUTIpN t3F EFFLUENT: - <br /> A minimum of 12 inahes of soil defined as sand shail be placed where the filter materiai is#o be <br /> located: A crawler tractor with a biade or bucket shall be used to move the sand into place. At <br /> least 6 inches of sand shall be kept under the tracks ta minimize compacting of the plowed <br /> layer. The sand layer upon which the filter mate�ial is placed shall be level. ' <br /> Sand �s defined as a'soil texture campased by weight of at (east 25 percent of very`coarse and <br /> medium same, vary'rng in size fram 2.Q to Q.25 mm, less than 50 percent of fine c�r very �ne <br /> sand ranging in size between Q.25 and Q.05 mm, and na more than:14 percent of particles <br /> smaller than 0.05 mm: <br /> A minimum depth af 9 inches of filter material (rock) shal!'be placed on the sand layer priar to <br /> installing the distribution pipe. <br /> Filter material is defined as clean rack, crushed igneous rock or similar insoluble, durable and <br /> decay-resistant material free from dust, sand, silt br clay. The size sha11 range from '!. inch <br /> diarneter.to 2'/z inch diameter. <br /> PRESSURE DISTRIBUTI4N: <br /> In each bed, the effluent shall be distributetl aver the �lter materi�l by' three 2 inch diameter <br /> perforated pipes under pressure 73#eet long. Perfaration holes shall be %d inch diameter drilled <br /> in a straight line along the length of the pipe. Hole spacing shall be 36 inches with 25 <br /> perforatians per IateraL Holes shall be drilled straight into the pipe and not at an angle. A sharp <br /> drill shall be used antl any burrs in the inside of the pipe shall be removed. The pertarated pipe <br /> laterals shall be installed level with the perforatians downward. <br /> The perforated pipe laterals shail be connected to a 2 inch diameter manifold pipe and shall <br /> haue #heir ends capped; ' The laterals sha0 be spaced 36 inches on center and at 20 inches <br /> from#he�dge of the filter materiaL <br /> The rnanifold pipe shall be connected to the supply pipe from the pump. The rnanifold shall be <br /> s{oped taward the supply pipe firom the pipe. <br /> Geo-textile material shalf be placed aver the filtsr rnateriaL ' <br /> Constnac#ion vehicles shall not be allowed an the filter material until backfill is placed. <br /> Sandy loam soil shall be placed on the filter mate�iaf to a depth af 12 inches in th+�cen#er of the: <br /> maund and to a depth of 6 inches at the sides. <br /> Six inches of#opsoil sk�all be placed on the fill material over the entire area of the mound: A <br /> grass cover shall be established over the entire area of the mound. No shrubs shaH k�e ptanted <br /> on the top of the mound. Shrubs may be placed at the foot and sitle slopes of the mound. <br /> The side slopes of the mound will be 3 feet horizontal to 1 faot vertical (3:1). The soil ma#erial at <br /> the tae of the dike should be slightly iess permeable or somewhat tighter than the na#ural soil <br /> belaw#he mound. This can be accomplished by selecting a#iner soil or by compaction. <br /> Whenever mounds are lacated on slope�, a diversion shall be constructed immediately up slope <br /> from the mound to intereept and divert runaff: <br /> 9 West Diyision Street; Bu�falo, MIV 55393 • 763-682-4727 • Fax 763-682-3522 • www.offaassc�ciates.com <br />