My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00560 - septic replacement
Orono
>
Property Files
>
Street Address
>
K
>
Kokesh Farm Road
>
515 Kokesh Farm Road - 31-118-23-14-0009
>
Septic
>
2016-00560 - septic replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:26 PM
Creation date
4/12/2017 3:29:41 PM
Metadata
Fields
Template:
x Address Old
House Number
515
Street Name
Kokesh Farm
Street Type
Road
Address
515 Kokesh Farm Road
Document Type
Septic
PIN
3111823140009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'� 5. DISTRIBUTION MEDIAr REGfSI'ERED TREATMEN'f PRQDUCTS:CHAMBERS AND EZF�OW <br /> A. Enter Dispersal Media: <br /> B. �nter the Gomponent Length: �ft Enter the Component Width: �ft <br /> C. Numbe�of Components per Row=Bed Length divided by Companent Length (Raund up) <br /> C� ft ' �,.� ft= C_._Jtomponents/row <br /> D. Actual Bed Length = Number of Camponents/row X Component Len�gth: <br /> �components X �ft = �ft <br /> E. Number of Rows=Bed Width divided by Component Width (Round up) <br /> C� ft- � #t= � rows Adjust width w thfs is on who(e number. <br /> F. Total Number of Components=Number of Components per Row X Number of Rows <br /> � x � _ �components <br /> 6. MOUND SIZING <br /> A. Catculate Minimum Ctean Sand Lift: 3 feet minus Depth to Limiting Condition =Ctean Sand Lift <br /> 3.0 ft - 1.0 ft = 2.0 ft Design Sand Lift(optional): �ft <br /> B. Calculate Upslope Height: Clean Sand lift +media depth+cover(t ft.) = Upslope Height <br /> 2.A ft + 1,p ft + 1.0 ft= 4.0 ft <br /> C. Select Upslope Berm Multiptier(based on la�d slope): 2.06 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 Lar�d Slope <br /> Upsiope Berm 3:1 3.00 2.91 2.83 2:7S 2:68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 Upslope Berrr <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2,$6 2.78 2.7Q Ratfo <br /> D. Catcutate Upslope Berm Width:Muttiplier X Upstope t�und Height =Upstape Berm Width <br /> 3.06 ft X 4.0 ft = $.2 ft <br /> E. Calcutate Drop in Etevation Under Bed; Bed Width X Land 5lope i 100=Drop(ft) <br /> 10.0 ft X 8.0 % � 100= Q.80 ft <br /> F. Calculate Downslope Mound Height: Upslope Height+Drop in Elevation =Downslope Height <br /> 4.0 ft + 0.80 ft = 4.$ ft <br /> G. Select Downslope Berm Multiplier{based on tand slope): 5.88 <br /> Land Slope!o Q 1 2 3 4 S 6 7 8 9 10 11 ' 12 Land Slo e <br /> Dawnsiope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3,$0 3.95' 4.11 4.29 4.48 4.69 �ownsiope <br /> Berm Ratio 4:1 4.00 4.17 435 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.14 7.69 Berm Ratio <br /> H. Catculate Downslupe Berm Width: Multiptier X Dawnslope Height =Downstope Berm Width <br /> 5•88 x 4.8 ft = 28.2 ft <br /> I. Calcutate Minimum Berm ta Cover Absorption Area: Downslope Absorption Width +4 feet <br /> 16.0 ft +� 4 �ft = 20.0 ft <br /> J. Design Downstope Berm =greaCer of 4H and 41: 28.2 ft <br /> K. Select Endslape Berm Muttiptier: 3.00 (usuntty 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Maund Height =Endslope Berm Width <br /> 3.00 ft X 4.8 ft = 14.4 ft <br /> M. Calculate Mound Width: Upstape Berm Width+ged Width +Downslope Berm Width <br /> 8.2 ft + 10.0 ft + 28.2 ft = 46.5 ft <br /> N. Calculate Mound Length: Endslope Berm Width +ged L.ength + Endslope Berm Width <br /> 14.4 ft + 75.0 ft + 14.4 ft = 103.8 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.