Laserfiche WebLink
REVISED SITE EVALUATION REPORT for Lot 4, Block 1, Kokesh Farm <br /> Sewage Treatment System Page 2 <br /> GENERAL INFORMATION <br /> This design is for a Type l, 5 bedroom home and in accordance with the Minnesota Pollution Control <br /> Agency Standards and local ordinances. <br /> A seasonally high water table was evidenced at 20 inches of depth in Soil Boring 10. The slope is about <br /> 3%. <br /> The soils at a depth of 12 inches in Test Hole 10, 11 & 12 and have an average percolation rate of 20 <br /> minutes per inch. All neighboring wells are located more than 100 feet away from the proposed trea.tment <br /> azea. <br /> NOTES: <br /> Keep all heavy equipment off the proposed treatment area before and after construction as much as <br /> possible. The treatment area should be marked offbefore construction. <br /> With proper installation and maintenance this system should have no problem in treating septic ef�luent <br /> effectively. <br /> It is recommended that the septic tanks be pumped every 2 years. <br /> MOUND SYSTEM: <br /> Flow: 5 bedroom= 150 gallon/day/bedroom 150 x 5 = 750 gallons per day. <br /> 750 GPD x 1.00= 750 square feet. <br /> 10 foot wide rock bed 75 feet long= 750 square feet <br /> CONSTRUCTION EOUIl'MENT: <br /> A rubber-tired tractor may be used for plowing or disking to prepare the soil surface but in no case shall <br /> a rubber-tired tractor be used after the surface preparation is completed. A crawler or tract-type tractor <br /> sha11 be used for mound construction. <br /> SOIL SURFACE PREPARATION: <br /> The discharge pipe from the pump to the mound area sha11 be installed prior to soil surface preparation. <br /> The trench excavated to install the discharge pipe shall be carefully backfilled and compacted to prevent <br /> seepage of ei�luent. <br /> The total area selected for the mound, including that under the dikes, sha11 be roughened in order to <br /> thoroughly break up any e�sting sod layers and to provide a suitable transition zone between the original <br /> soil and sand layer of the mound. The area sha11 be roughened only when the moisture content of the soil <br /> 8 inches below the surface is drier than the plastic limit. <br /> Surface preparation or roughening may be performed with a mold board plow, a disk plow, or a back hoe <br /> using only the teeth. Mold boazd plow furrows shall be at least 8 inches deep, sha11 be thrown up s�ope and <br /> sha11 run perpendicular to the slope. There shall be no dead furrow under the mound. <br />