My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#4641-Prelim. plat-2001
Orono
>
Property Files
>
Street Address
>
K
>
Kokesh Farm Road
>
490 Kokesh Farm Road - 31-118-23-14-0010
>
Resolutions
>
#4641-Prelim. plat-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:27 PM
Creation date
4/12/2017 2:49:41 PM
Metadata
Fields
Template:
x Address Old
House Number
490
Street Name
Kokesh Farm
Street Type
Road
Address
490 Kokesh Farm Road
Document Type
Resolutions
PIN
3111823140010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i�� <br /> � O� <br /> O O <br /> , C ITY of URONO <br /> � � � <br /> '�' RESOLUTION OF THE CITY COUNCIL <br /> ��'9ltE p4��'G NO. <br /> �sx � <br /> (Private Road) � <br /> 3. The private road, to be constructed within Outlot A, shall be developed to City <br /> requirements (Section 11.33, Subd. 4) for private roads serving 4 units. Code <br /> requires a 50' platted right-of-way, and the minimtun paved width of the street <br /> to be 24'. The cul-de-sac shall be platted 50' in radius with a minimum paved <br /> radius of 40' <br /> 4. The private road will be constructed with rural sections, subject to review and <br /> approval by the City Engineer. <br /> 5. Private road construction shall be subject to a Developers Agreement to be <br /> executed between the City and the developer. Private road construction can <br /> begin as soon as the engineering plans for the road as well as stormwater <br /> management plans have been approved by the City, the Developers Agreement <br /> has been executed, and the final plat has been recorded with Hennepin County. <br /> 6. The private road shall be privately owned and maintained per the appropriate <br /> access easement/maintenance documents to be executed by the developer. The <br /> developer shall create a homeowners association for such ownership and <br /> maintenance. <br /> 7. No building permits will be issued until the private road base work and all <br /> stormwater management improvements have been completed by the developer <br /> and approved by the City. <br /> 8. The developer shall grant to the City an underlying Road and Utilities Easement <br /> for Outlot A. <br /> (Landscaping) <br /> 9. Subdivider shall plant boulevard trees along the private road per the requirements <br /> of Section 11.60, Subd. 2. <br /> (Stormwater Management Plan/Wetlands) <br /> 10. Subdivider shall construct stormwater management improvements generally as <br /> shown on the Preliminary Grading, Drainage and Erosion Control Plan dated <br /> Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.