My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01222 - new septic
Orono
>
Property Files
>
Street Address
>
K
>
Kintyre Lane
>
180 Kintyre Lane - 32-118-23-43-0018
>
Septic
>
2013-01222 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:57 PM
Creation date
4/12/2017 12:22:40 PM
Metadata
Fields
Template:
x Address Old
House Number
180
Street Name
Kintyre
Street Type
Lane
Address
180 Kintyre Lane
Document Type
Septic
PIN
3211823430018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. ABSORPTION AREA SIZING � <br /> Note:Mound setbacks are meawred from the Absorption Area. <br /> A. Calcutate Absorption Width:Bed Width (2.8)X Mound Absorption Ratio (t.F)=Absorption Width <br /> 10.0 ft X 2.4 = 24.0 ft <br /> B. For slopes>1%,the Absorption Width is measured downhill from the upslope edge of the Bed. <br /> Calculate Downslope Absorption Width:Absorptfion Width (3.A)-Bed Width (2.6)=ft <br /> 24.0 ft - 10.0 ft = 14.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate C(ean Sand Llft: 3 feet minus Depth to Lfmiting Condition (1.C)=C(ean Snnd Lift (t ft minimum) <br /> 3.0 ft - 1.2 ft = 1.8 ft Design Sand Lift(optional): �1.8 <br /> B. Calculate Upslope Heiqht:Cleon Sond Lift (4.A)+medla depth +cover (1 ft.)=Ups(ope Height <br /> 1.8 ft + 1.0 ft + 1.0 ft= 3.8 ft <br /> D-34,Sto�x Multi�lirr T�ie <br /> �510p��, 0 t 2 # � i 6 7 6 9 10 fl 1Z Y3 1� iS 16 17 1! 14 29 21 23 t7 2� 25,' <br /> UQS��P E 3:1 3.iq 2,41 2.�3 1.75 2.66 3.b1 2,5�i.AB 2.d2 2.3b I.31 2.26 2.21 2�7 2.13 Z�i Z05 2.03 2.06 1.97 5.95 1.93 1.9t t,$4 1.8t t.$5 <br /> $emt Rdt?���:t d:40 3.85 3.70 3.57�.�5 3.33 3:'�3.12 3.03 2.44 1.�2.78 1.7fl I.bI 2.55 2.16 2.�t 2.?i 2.T9' 2:23 3.IE i.i3 2:�6 2.�3 i�98 f.�3 <br /> LdMf5�96 4 f 2 3 t S b J ¢ 9 i9` t1 Il 13 II �5 tb 17 I! t� � ti I2 23 Ii 15. <br /> _ <br /> (3bW1YilOp2 �3:1 3.0!!3.Q�1 3.14 3.3D 3.tt 3.53 3.56 3.8d 3.45�f.11 d,29 9.d8 d.64�1,4ia 5.2A 5.i5 S.SH d.2d b.b3 7.t� 1.d7 7.93 S.d2 8.43 9,d6 1s1.Ot <br /> Serm Rai',o �:t d.p�4tl�.���,5��:I6 5:4�5,26 5.56 5;86 6.�5 d.b7 7;1��.bf 8:�9 8.92 9:57 tb19 t�.�d it.d7 t2.a�'1�;19 i1.f� t�;ST 95.b�1b:5�it;d� <br /> Select Upslope Berm Multiplier <br /> �' (based on tand slope): 2.70 (figure D-34) <br /> D. Catculate Upslope Berm Width:Muttiplier (4.C)X Upslope Mound Height (4.6)=Upslope Berm Width <br /> 2.70 ft X 3.8 ft = 10.4 ft <br /> E. Calcu(ate Drop in Elevat�on Under Bed:Bed Width (2.B) X Lond S(ope (1.D)=100=Drop (ft) <br /> 10.0 ft X 12.0 % :- 100= 1.20 ft <br /> F. Calcutate Downslope Mound Height:Upslope Height (4.B)+Drop in Elevatlon (4.E)=Downslope Heighi <br /> 3.8 ft + 1.20 ft = 5.0 ft <br /> � Select Downslope Berm Multiplter <br /> (based on land stope): 7.69 (figure D-34) <br /> H.Calculate Downs(ope Berm Width:Mu(tiplier (4.G)X Downs(ope Heiqht (4.F)=Downslope Berm W1dth <br /> 7.69 x 5.0 ft = 38.7 ft <br /> I. Calcutate Minimum Berm to Cover Absorpiion Are4:Downs(ope Absorption Width (3.6 or 3.C)+4 ft.=ft <br /> 14.0 ft + � ft - 18.0 ft <br /> J. Deslgn Downslope Berm =greater of 4H and 41: 38.7 ft <br /> K. Select Ends(ope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Catculate Endslope Berm (4.K)X Downslope Mound Height (4.F)=Endslope Berm Width <br /> 3.00 ft X 5.0 ft = 15.1 ft <br /> M.Catculate Mound Width:Upslope Berm Width(4.D)+Bed W1dth (2.B)+Downslope Berm Width (4.J)=ft <br /> . 10.4 ft + 10.0 ft + 38.7 ft = 59.1 ft <br /> N. Calculate Mound Length:Endslope 8erm Width (4.L)+Bed Length (2.C)+Endslope Berm Width (4.L)=ft <br /> 15.1 ft + 63.0 ft + 15.1 ft = 93.2 ft <br /> Comments- <br />
The URL can be used to link to this page
Your browser does not support the video tag.