My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00950 - new structure
Orono
>
Property Files
>
Street Address
>
K
>
Kintyre Lane
>
140 Kintyre Lane - 32-118-23-43-0019
>
Permits/Inspections
>
2015-00950 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:59 PM
Creation date
4/12/2017 9:52:39 AM
Metadata
Fields
Template:
x Address Old
House Number
140
Street Name
Kintyre
Street Type
Lane
Address
140 Kintyre Lane
Document Type
Permits/Inspections
PIN
3211823430019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 f <br /> Christine Mattson <br /> From: Christine Mattson <br /> Sent: Tuesday, September 01, 2015 8:18 AM <br /> To: 'Brad Hale' <br /> Cc: 'ethan@gonyeacompanies.com'; Jon Connolly Qon@gonyeacompanies.com); Dave <br /> Pemberton; Melanie Curtis <br /> Subject: 140 Kintyre Lane/#2015-00950 <br /> Attachments: Survey Requirements-August 2015.pdf <br /> Good morning, <br /> Our engineer has approved the survey dated 8-20-2015, but please note, if during construction it appears the retaining <br /> wall will be over 4 feet in height an engineered design must be submitted and approved prior to its construction. <br /> Also,we have recently changed our survey requirements, copy attached. One of the new requirements is to show the <br /> point or spot where the top of the foundation elevation reference elevation point is being measured from;we expect <br /> this to be consistent with the measurement on the foundation as-built. Please show the measurement point on the <br /> survey and drop off or mail two full-size copies of the survey so we can finalize our review and issue the building <br /> permit. This same location should be referenced on the foundation as-built. <br /> Thank you and as always, please don't hesitate to contact us with any questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway p Orono j MN � 55356(physical addressJ <br /> PO Box 66 ( Crystal Bay � MN I 55323-0066(mailing addressJ � <br /> tii' 952.249.4620 � g 952.249.4616 <br /> � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 18 through Friday,September 4,2015) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday,September 7, 2015 <br /> From: Brad Hale [mailto:bhale@sathre.com] <br /> Sent:Thursday,August 27, 2015 4:00 PM <br /> To:Christine Mattson<CMattson@ci.orono.mn.us> <br /> Cc: 'ethan@gonyeacompanies.com' <ethan@gonyeacompanies.com>;Jon Connolly(jon@gonyeacompanies.com) <br /> <jon@gonyeacompanies.com>; Dave Pemberton<pemberton@sathre.com> <br /> Subject: Lot 2, Block 2, Kintyre Two <br /> Christine, <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.