My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00290 - retaining wall
Orono
>
Property Files
>
Street Address
>
K
>
Kintyre Lane
>
140 Kintyre Lane - 32-118-23-43-0019
>
Permits/Inspections
>
2016-00290 - retaining wall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:42:01 PM
Creation date
4/12/2017 9:50:04 AM
Metadata
Fields
Template:
x Address Old
House Number
140
Street Name
Kintyre
Street Type
Lane
Address
140 Kintyre Lane
Document Type
Permits/Inspections
PIN
3211823430019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orono, MN Code of Ordinances Page 3 of 3 <br /> 1. Eledrical connedion. <br /> i. A watertight,lockable electrical box must be mounted on a four-inch-by-four-inch treated redwood <br /> or cedar post. <br /> ii. All electrical connections shall be made within the box. Pump connection must not be made using a <br /> direct line(plug-in only).Wire entry to the electrical box shall be sealed with a watertight material <br /> such as foam or putty. <br /> iii. Alarm and pump floats shall be on separate electrical circuits. <br /> iv. Electrical wire from the power supply must not run over any tanks but must be laid beside the tanks <br /> and placed in conduit along the electrical post. <br /> v. Electrical cords from the pump and floats must be run through a two-inch PVC(or equivalent) <br /> conduit(schedule 80)with a one-inch gap between the conduit and the electrical box. Electrical <br /> cords must not run through or under the manhole cover.Wires must not have ground contact. <br /> 2. Pumping chamber. <br /> i. Pressure pipe exiting the pumping chamber must be laid on a uniform slope up to the soil <br /> treatment area for proper drain back.The pressure pipe must be sleeved inside a larger diameter <br /> pipe for additional support if spanning ground that has been excavated. If the pipe at the tank must <br /> be lower than union to get elevation for drain back,a one-quarter-inch weep hole must be used. <br /> ii. When the soil depth above the pressure distribution pipe is less than 3Yz feet,insulation must be <br /> added to achieve an insulating factor equal to 3�z feet of soil to decrease the potential for freezing <br /> (Styrofoam or concentric piping are acceptable methods). Piping under hardcover,such as tennis <br /> courts or driveways,shall be insulated pipe or equivalent. <br /> iii. A reserve capacity equaling 75 percent of the anticipated daily flow must be allowed in the pumping <br /> chamber between the alarm activation level and the pump tank inlet. <br /> d. Drainfields. <br /> 1. Trenches.Trenches must meet Minnesota Rules chapter 7080. <br /> 2. Mounds and atgrades. Mounds and at-grades must meet specifications per Minnesota Rules chapter <br /> 7080. <br /> (3) Compliance standards. <br /> a. A new system shall be located,designed and constructed as a code system. <br /> b. When an existing code system is repaired or expanded,such ISTS shall remain a code system.Compliant <br /> systems,when repaired,shall be upgraded to a code system status whenever such classification is <br /> reasonably attainable. <br /> (4) Construdion procedures. <br /> a. Protection of drainfield area. Proposed drainfield areas shall be identified and marked off on the lot at the <br /> time of the site evaluation and prior to any construction or grading occurring in the area.The drainfield area <br /> shall remain undisturbed until drainfield construction is commenced. No vehicular traffic shall be allowed in <br /> the drainfield area either before or after drainfield installation. <br /> b. Favorable weather required. Drainfield area or trench construction must not proceed if the area is wet or has <br /> had rain within 48 hours.Mound or trench construction shall not proceed unless the soil moisture content is <br /> below the plastic limit. <br /> c. Construction inspection required.The contractor issued a permit for ISTS construction shall perform all work <br /> according to the design specifications approved by the city for each particular ISTS.All subsurface work, <br /> including building sewer,sewage tanks,distribution system and soil treatment area shall be inspected by <br /> the city inspector prior to backfilling or covering of any portion thereof. It shall be the responsibility of the <br /> contractor to notify the city at least 24 hours prior to the time an inspection will be required,and it shall be <br /> the responsibility of the contractor to ensure that the inspection is accomplished and the construction is <br /> approved prior to any backfilling,covering or continuation of the construction. <br />(Code 1984,§12.30(5);Ord. No. 100 2nd series,§4,2-10-1992;Ord. No. 147 2nd series,§§ 11-15,5-13-1996;Ord. No. <br /> 199 2nd series,� 1(1230(5)),5-8-2000;Ord. No.38 3rd series,§ 1,9-24-2007) <br /> about:blank 3/31/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.