My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01089 - mound system
Orono
>
Property Files
>
Street Address
>
K
>
Kintyre Lane
>
125 Kintyre Lane - 32-118-23-43-0017
>
Septic
>
2014-01089 - mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:54 PM
Creation date
4/12/2017 9:02:06 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Kintyre
Street Type
Lane
Address
125 Kintyre Lane
Document Type
Septic
PIN
3211823430017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' S. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS:CHAMBERS AND EZFLOW <br /> A. Enter Dispersa!Media: <br /> B. Enter the Component Length: ��ft Enter the Component Width: �ft <br /> C. Number of Components per Row=Bed Length divided by Component Length (Round up) <br /> � ft : � ft= �components/row <br /> D. Actuat Bed length =Number of Componentslrow X Component Length: <br /> �components X �ft = �ft <br /> E. Number of Rows=Bed Width divided by Component Width(Round up) <br /> � ft ' � ft= C� �ows Adjust width so this is an who(e number. <br /> F. Totat Number of Components=Number of Components per Row X Number of Rows <br /> � X � _ �components <br /> b. MOUND SIZING <br /> A. Calcutate Minimum Ciean Sand Lift: 3 feet minus Depth to Limiting tondirion =Clean Sand Lift <br /> 3.0 ft - 1 J ft = 1.3 #t Design Sand L.ift{optionat): ��ft <br /> 6. Calcutate Upstope Height: Clean Sand Lift +media depth +cover(1 ft.)=Upstope Height <br /> 1.3 ft + 1.0 ft + 1.0 ft= 3.3 ft <br /> C. Setect Upstope Berm Multiptier(based on land slope): 3.03 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Calculate Upstope Berm Width:Muttiptier X Upslope Mound Height = Upslope Berm Width <br /> 3.03 ft X 3.3 ft = 10.0 ft <br /> E. Catcutate Drop in Elevation Under Bed: Bed Width X Land Slope= 100=Drop(ft) <br /> 10.0 ft X 8.0 % : 100= 0.80 ft <br /> F. Catculate Downslope Mound Height: Upsiope Height+Drop in Elevation =Downslope Height <br /> 3.3 ft + 0.80 ft = 4.1 ft <br /> G. Select Downslope Berm Multiptier(based on land slope): 3.95 <br /> Land S1ope% 0 i 2 3 4 5 6 7 8 9 10 11 12 <br /> Downslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 �3.29 4.48 4.69 <br /> Berm Ratio 4:1 4.00 4.17 4.35 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Catculate Downslope 8erm Width: Muttiptier X Downstope Height =Downslope Berm Width <br /> 3.95 x 4.1 ft = 16.3 ft <br /> I. Catculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width +4 feet <br /> 10.0 ft +�ft = 14.0 ft <br /> J. Design Downstope Berm=greater of 4H and 41: 17.0 ft <br /> K. Setect Endslope Berm Muttiptier: 3.00 (usual(y 3.0 or 4.0) <br /> L. Calcutate Endslope Berm X Downslope Mound Height =Endslope Berm Width <br /> 3.00 ft X 4.1 ft = 13.0 ft <br /> M. Calculate Mound Width: Upstope Berm Width + Bed Width + Downslope Berm Width <br /> 10.0 ft + i0.0 ft + 17.0 ft = 37.0 ft <br /> N. Calcutate Mound Length: Endstope Berm Width + Bed Length + Ends{ope Berm Width <br /> 13.0 ft + 63.0 ft + 13.0 ft = 89.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.