Laserfiche WebLink
i � . <br /> •' ' ' r <br /> ,' 14. �ROSION CO�ITR4L. Prior to initiating site grading, the storm water pollution <br /> prevention plan,a��d the erosion contral plaa,Plan B,shell be implemented by the Developer and inspected <br /> and approved by the City. 'The City may impose additionat erosion control requirements if reasonably , . <br /> required. Al[areas disturbed by escavation and bac[cfiliir�g operations shall be reseeded within five(5)days <br /> ' after the completion of the work, �veather permitting, or in an area that is inactive for more than ten (10) <br /> days untess authorized and approved by the City Engineer: Except as othenvise provided in the.erosion . <br /> control plan, seed shatl be in eccordance with the City`s current seeding specification which may include ' <br /> certified oat seed #o provide a temporary ground c�ver as rapidly as possible. All seeded areas shall be <br /> fertilized, muiched, and disc anchored as necessary for seed retention.The parties recognize that time is of <br /> the essence in controlling erosion. If the Deveioper does not comply with the erosion control plun and <br /> schedu(e or supptementary instructions received from the City, the City may tuke s��ch action as it deems <br /> , appropriate to contro!erosion. The City will endeavor to no�ify the Develope�in advance of any praposed , <br /> • action, but failure of the City to do so wi11.not affect the Dsveloper's and City's rights or obiigations ' <br /> hereunder. If ihe Developer daes not reimburse the City for any cost the City incurred for such work within . <br /> ten {10) days, the City may draw down the "security" to pay any costs. No developmeni, utiiity or street <br /> construction will be alfowed and no building permits will be issved unless the T and is in ful4 compliance <br /> with the approved erosion control plan. � <br /> , 15. GRADING PLAN. The Land shall be graded in accordance with the approved gmding <br /> development and erosion control plan, Plan"B". The plun sha11 conform to City of Orano specifications. <br /> Within thirty (30} days after completion of the grading and before the City approves individuAl building <br /> pern�its the Devcloper shall provide the City with an"as constructed"grading plan certified by a registered <br /> land surveyor or engineer that all ponds, s.vales, and ditches for public drainage have been constructed on <br /> . public easements or lund owned by the Gity. Nohvithstanding the foregoing, the City may issue building <br /> germits to the Developer,prior to completion of all gading,provided the City Engitieer has determined that <br /> � adequate erosion contml measures are in place. The "as constructed" plan shall inciude fietd verified <br /> � t 52891 v03 5 ORONO:Karnree Two <br /> SN4vUsrn:r0712312010 • . (Andradc Land Company/MacKinnon) <br />