Laserfiche WebLink
�/ <br /> � <br />.�-�" <br /> fi � �� � � <br /> �� � <br /> '"""� . � ^ I� Dail Soil Observation Notes <br /> Y <br /> Project No: Date: Report No: <br /> Project Ndme: Project Location: <br /> Client: Temp/Weather: <br /> Project Manager: Time Arrived: Departed: <br /> f Y� � � .r- P z � r �� . 1 <'� <br /> •Y - ��T�a' .1a. <br /> Areas Observed: ❑ Building Pad ❑House Pad �� ❑Roadway ❑Parking/Walks ❑ Footing <br /> ❑Proof Roll []Other(describe): <br /> Soil report available? ❑ Yes No Report reviewed? ❑Yes ❑No Report prepared by: <br /> Finish floor evaluation: Bottom of footing elevation: ' Bottom of excavation elevation: - <br /> Approved plans available? ❑Yes ❑No Specified compaction: Fill source: <br /> Oversizing appears adequate? �NA ❑Yes ❑No Soils observed agree with Soils report? .. ❑Yes ❑No <br /> Soils appear adequate for design loads? �]Yes ❑No Proposed project brvsing capacity(psf): <br /> Contractor notified of results? ��Yes ❑No Name of person notified: <br /> Was a copy of this report left on site? Yes ❑No If so,whom was it submitted to? <br /> N , . <br /> � A , <br /> ��� <br /> � <br /> i I <br /> � <br /> ' <br /> i <br /> _ .... <br /> 1� <br /> Notes/Comments: <br /> '; , .( <br /> Performed By: Reviewed By: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br />