My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00762 - septic
Orono
>
Property Files
>
Street Address
>
K
>
Kintyre Lane
>
100 Kintyre Lane - 32-118-23-43-0020
>
Septic
>
2015-00762 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:42:04 PM
Creation date
4/11/2017 2:04:56 PM
Metadata
Fields
Template:
x Address Old
House Number
100
Street Name
Kintyre
Street Type
Lane
Address
100 Kintyre Lane
Document Type
Septic
PIN
3211823430020
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRQDUCTS: CHAMBERS AND EZFLOW <br /> • A. Enter Dispersal Media: <br /> B. Enter the Component Length: �ft Enter the Component Width: �ft <br /> C. Number of Components per Row= Bed Length divided by Component Length (Round up) <br /> �� ft - �� ft= �components/row <br /> D. Actual Bed Length = Number of Components/row X Component Length: <br /> �tomponents X ��ft = ��ft <br /> E. Number of Rows= Bed Width divided by Component Width (Round upy <br /> � ft - �� ft= �� rOWS Adjust wldth sa this ts on who(e number. <br /> F. Totat Number of Components= Number of Components per Row X Number of Rows <br /> � X � ' ��components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Clean Sand Lift <br /> 3.0 ft - 1.8 ft = 1.2 ft Design$and Lift (optional): ��ft <br /> B. Calculate Upskope Height: Clean Sand Lift +media depth +�aver{1 ft.) = Upslope Height <br /> 1.2 ft + 1.0 ft � 1.0 ft= 3.2 ft <br /> C. Select Upslope Berm Multiptier(based on land slope): 3.45 <br /> La�d Slape 9b 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.� 3.85 3.7i1 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2J8 2,70 <br /> D. Calculate Upslope Berm Width: Multiplier X Upsiope Mound Height = Upstope Berm Width <br /> 3.45 ft X 3.2 ft = 10.0 ft <br /> E. Calculate Drop in Etevation Under Bed: 8ed Width X Land Slope = 100= Drop (ft) <br /> 10.0 ft X 4.0 � = 100= 0.40 ft <br /> F. Calculate Downslope Mound Height: Upslope Height + Drop in Elevation =Downslope Height <br /> 3.2 ft « 0.40 ft = 3.6 ft <br /> G. Select Downslope Berm Muttiptier(based on land stope): 4.76 <br /> �and Slope% 0 1 2 3 4 S b 7 8 9 10 11 ' 12 <br /> Downslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.$0 3.95 4.11 4.29 4.48 4.69 <br /> BermRatio 4:1 4.00 4.17 4.35 4.54' 4.7b 5.00 5.26 °5.56 5.88 6.25 6.67 7.14 '7.69 <br /> H. Calculate Downslope Berm Width: Multiplier X Downslope Heighi = Downslope Berm Width <br /> 4.76 x 3.6 ft = 17.0 ft <br /> I. Catculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width + 4 feet <br /> 10A ft +� 4 �ft = 14.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 20.0 ft <br /> K. Select Endslope Berm Multiptier: 3.OQ (usually 3.0 or 4.0) <br /> L. talculate Endslope Berm X pownstope Mound Height =Endstope Berm Width <br /> 3.00 ft X 3.6 ft = 11.0 ft <br /> M. Calculate Mound Width: Upslope Berm Width + Bed Width + Downslope Berm Width <br /> 10.0 ft + 10.0 ft + 20.0 ft = 40.0 ft <br /> N. Calculate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> 11.0 ft + 63.0 ft + 11.0 ft = 85.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.