Laserfiche WebLink
� ' ' TRENCH AND BED WORKSHEET <br /> 1. AVE�ZAGE DESIGN FLOW �-i: Erflmabd S�wap�flows In Galloru p�r Day <br /> A. Estimated (�+l'�L� gpd(see figure A-1) num r o <br /> or measured �' x fety fu gpd badroome c�� c�u n ao�.m Gau tv <br /> 1,�fsa ctor)_ <br /> 2 300 225 180 6096 <br /> B. Se tic tank capacity /S00 gallons lsee figure C-1) s 4so soo 2ts ot me <br /> C���4�— G}?-�4v�1�i�. �z��� S�y�j�„1 '1gA{1}''�¢�'P 4 600 375 256 values <br /> �- /Ot90 eJ.�l C�'all+la G}}pjyv�yyPr r� (000 eawl N'�ti-1VS'1�'�FW�►l'� b 750 A50 294 In the <br /> 2. SOILS(Stte evaluation data) w-,Sc�o g.,i ��,,.,Q v�1.q.vr,.��: a 900 625 3s2 ciass i, <br /> C. Depth to restricting layer= a.� , a.3 _ a, � feet > >� � s�o u,or m <br /> 8 1200 675 408 columns. <br /> D. Max depth of system Item 2C-3 ft= /oo • �ft-3iT! —ft �y�,s�.n� �,� 5,�,�.,4�.� ,,���� <br /> E. Texture 1-0 Xl'Y✓� Percolation rate Ty • 1 NII'I i o�,.� � ��,q�,u u i,o,1,i,�.s6 <br /> F. Soil Sizing Factor(SSF) �sqft/gpd(see figure D-15) <br /> G. %Land Slope 3 % ca:Se dcTankG dees ,uoos <br /> 3. TRENCH or BED BOTTOM AREA Number of Miuimnm Li uid Wd� Liquid capacity <br /> Bedrooms 9 �1 Pecity with with disposal& <br /> H. For trenches with 6 inches of rock below the pipe: �'ry �"�d��� lift inside <br /> A x F=_�vr d x sqft/gpd= sqft s«i� �so �izs <br /> I. For trenches with 12 inches of rock below the pipe: 3«a t000 �soo 2� <br /> A x F x 0.8= _�nr d x sqft/gpd x 0.8= sqft ��s m 9 a�.o�oo s�oo�o 300° <br /> J. For trenches with 18 inches of rock below the pipe: <br /> A x F x 0.66=_��i d x sc�ft/gpd x 0.66= sqft �Mor ssb-Cj(�3 s°`a aa�r�a sou sizsng <br /> K. For trenches with 24 inches of rock below the pipe: ..ro�.d� k F,�,m <br /> A x F x 0.6=_�,�d x scjft/gpd x 0.6= sqft m�i"`°"i"d' �T"""^ 'q�a�"`r ��°" <br /> L. For gravity beds with 6 or 12 inches of rock below the pipe; ' o.��S�^°•1' ��°d o:� <br /> 1.5 x A x F=1S x__e»r d x sqft/gpd= sqft b.��s.. �,r,,,� ,.67 <br /> For pressure beds with 6 or 12 inches of rock belbw the pipe; 1�o� ����� <br /> A x F= o o d x I.1.7 sqft/gpd= /no z sqf� �4�q ��� <br /> 46 to 60 Gay Iwm 220 <br /> �����-�v� laoo Se��T. s.�a,.��.Y <br /> 4. ,DISTItIBiJTION(Check all that apply) �"y�'•y <br /> over 63 M 120"' CI� 4.20 <br /> �Bed (<6%slope) Drop boxes(any slope) Rock ,,,,,,�,�in120....�a��YY <br /> Trenches Distribution box(<3%) Chamber x ry.��.. �.�.P ,.�.,,,,� �,o,.: <br /> preuure distrfbutlon w terlal dbMbuHon with <br /> Pressure Gravity na�„�,��sx�r��«.� <br /> Gravelless �il having 3p`K or morc fU�ie a�and plus very fine nnd <br /> � "'A mound mwCbe ured.� <br /> 5. SYSTEM WIDTH,LENGTH and VOLUME �M other u per(orm�nee�y�Nm mu�t be wed <br /> M. Select trench width= ft D-9: Soll Charaeteristies and Soil sizing <br /> N. If using rock,divide bottom area by width: (H,I,J,K or L)+Nj= facton.(SS�for Gravelless Pipe <br /> nolatlon rate lineal feet/ <br /> — SQft+ ft= --- lineal feet (�in�nutes/�neh) soi!texture gauon/day <br /> Rock depth below dis bution pipe plus 0.5 foot times bottom area: Fa�ter than 0.1• co�s�a — <br /> 0.1 to 5 Medfum Sand 0.28 <br /> Rock depth in fe t+�feet x Area(H,I,J,K,or L) o.i�o s s��„dnd a.e <br /> (�S`�ft+G.�'r�)x 1 ae O sqh=_I��Q_cuft 6`o o �tA.�'m°"" o:s <br /> Volume in cubic yards=volume in cuft divided by 27 s�coas sv��,,, 0.6� <br /> �C11�'+-27=�Ct1yCiS 46 to 60 Clay Loam(CL) 0.74 <br /> San y Ct <br /> Wei t of rock in tons=cubic yards times 1.4 s�C►�cL _ <br /> cuyds x 1.4=�_tons °'ON1�`h°"�� �j'�j <br /> ry Y <br /> O. If using 10"Gravelless Pipe, Flow(A)x Gravelless SSF,(see figure D-9) su cr. <br /> 'Soil too coane for rewa treattnent. <br /> _�Ur CI X lineal feet/gpd= lineal feet Ux ayctema(or npid�y rmeable aolk. <br /> P. If uS1A Chambers H IT OI'IC/{,,as.ed on hei�},t of chamber slats + "�ilhaving5074ormore�nesand+very finesand. <br /> $ r i i!i \�+ b" � "nstallatlonof aihtandpar�d I hngr°ge�sy fom. <br /> width of chamber in feet(M) <br /> sqft+ ft= lineal feet GewnIMF�Mfr <br /> y• t 2-ROekCoae <br /> 6. LAWN AREA ,��p��,�, <br /> Q. Select trench spacing,center to center= feet <br /> R. Multiply trench spacing by lineal feet R x Q=sqft of lawn area �.�H <br /> _�ft x��lineal feet=�C�.Q sqft �-24•Ro�x <br /> 3/421/2" <br /> 7. LAYOUT � �•���,�,���, <br /> Include a drawing with scale(one inch= feet). Show pertinent property boundaries,rights-of-way,ease- <br /> ments, location of house,garage,driveway,and all other improvements, existing or proposed soil treatment system, <br /> well and dimensions of all elevations,setbacks and separation distances. <br /> I hereby certify that I have mpleted this work in accordance with applicable ordinances, rules and laws. <br /> ��' � (signature) 3�s�-1 (license#) � � � —�Z. (date) <br />