Laserfiche WebLink
t <br /> DETERMINING PERMIT FEES <br /> ❑ SAC Charge(2005 Rate=$1,550.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> �-Sewer Connection/Disconnect/Rep r($35.00/Per Stub) $ <br /> Pipe size � inches; material �Schd 40 air tested; cast iron <br /> ❑Water Connec�on/Disconnect/Re ir($35.00/Per Stub) $ <br /> Pipe size 1 inches; material�Schd 40 air tested;�copper <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ .50 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 1.50 <br /> 4. TOTAL PERMIT FEE (Add Lines 1-3 Above) $ <br /> ADDITIONAL 1NFORMATION—WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate pernut. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all wark in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made o this application are, true and correct. <br /> . <br /> A licant: Date: � � C—� <br /> PP <br />