Laserfiche WebLink
� 4 <br /> , SPEC'S Page 2 of 2 <br /> [] OWNER DIRECT"Not Included in Contract"ITEMS: <br /> SAWHORSE to assist in schedule coordination <br /> . LIGHT FI���'TURES, except those specifically listed above <br /> • Modifications to public utilities <br /> • Modifications to sprinkler system <br /> • Retaining wall <br /> • Tree&stump removal, landscaping <br /> • ABATEMENTS (lead or asbestos) <br /> • Corrections of existing substandard conditions(structural or me.chanical) <br /> Owner is responsible for all N.LC.obligations: <br /> Selections, schedule costs,liabilities and warranty issues. <br /> [] Clean up of buitding debris at job completion by SAWHORSE. <br /> Dumpster may be left on job site for building debris. <br /> (No tires, appliances or neighbor's mattress). <br /> [] Any yard damage REPAIR including trees, shrubs and all landscaping by OWNER. <br /> [] Satellite toilet facilities to be provided for duration of construction. <br /> Communication is essential for a successful projec� <br /> Project Manager: Brad Schoen (612-363-4611) <br /> Construction Administrator: Tra.cy Wright(763-533-0352 ext. 241) <br /> Weekend EMERGENCY Pager: 612-527-2590 <br />