Laserfiche WebLink
' Permit Application: Self-Checklist for Completeness <br /> Please note, the applicant must initial in the boxes below to acknowledge the minimum required <br /> information is included with the submittal. If not, the application will NOT be accepted. Call <br /> 952.249.4620 to schedule a meeting with staff if you have questions on application submittal <br /> requirements. <br /> � <br /> Completed Application <br /> � , <br /> Plan Review Fee Paid (�,D-� S� �� � I�� <br /> S i n e d E s c r o w A r �1 U�"" I r l G I L I.�e� <br /> g g e e m e n t & E s c r o w P a y m e n t <br /> � <br /> Building Plans (to scale) x2 <br /> � Certificate of Survey (to scale) showing the proposed project & <br /> meeting all requirements x2 <br /> Hardcover Calculations if a licable <br /> C �r ) <br /> �am aware that Orono will not issue a building permit without a <br /> /copy of MCWD permits or documentation from the MCWD statin <br /> ( 9 <br /> the proposed project does not trigger their permitting <br /> requirements). I will contact the MCWD at 952-471-0590 <br /> regarding this project. <br /> Signed by: ���/ <br /> Address: � <br /> Permit #: � <br /> Last Updated: January 2016 <br />