Laserfiche WebLink
L. Park Dedication The City Code requires dedication of 8% of the land as public <br />park, or payment of the equivalent value in cash. The City Council has determined <br />there is no need for dedication of land from the proposed development. Because of <br />the vastly differing land values in the city, the eight percent park dedication <br />requirement could result in park dedication requirements that are either <br />significantly greater than or significantly less than the amount which is roughly <br />proportional to the impact of the proposed development on the city's park system. <br />Periodically, therefore, the city will establish both a maximum and minimum park <br />dedication amount per dwelling unit based on an updated projection of the cost of <br />the city's park system and the proportionate share of this projected cost to be borne <br />by new dwelling units in the city. 8% of the value of the land is lower than the <br />minimum, so $3,250 per residential unit will be used. Therefore the park <br />dedication due at the time of Final Plat is $22,750.00. However, as part of the <br />original plat for the subject property, Leach Addition, (1978), three lots were <br />platted, and park dedication paid. Park dedication for four lots are due with the <br />Project. The adjusted park dedication is $13,000.00 (4 x $3,250.00) <br />M. Sewer and Water Connection Charges. Water connection charges paid as part of <br />the 1970 LW -1 project were 7.5 residential equivalent units. No additional water <br />connection charges have been identified. Assessed charges as part of the 1984 Lift <br />Station 7 and forcemain upgrade are owed as part of this project and amount to <br />$2,550.00 per unit ($610.00 + $1940.00). Based on 2016 fee schedule, the fees <br />are: <br />$0.00 for municipal water and <br />$17,850 for municipal sanitary sewer. (2,550.00 x 7) <br />These amounts will be due and payable at the time of final plat approval. <br />4. This approval is based upon the known issues that may affect this project, but this approval <br />does not limit the City from revising or amending these conditions as the review process <br />continues. <br />5. This Approval resolution approves the development concept subject to the applicant <br />meeting the requirements of this resolution and all other requirements of the City. This <br />resolution does not constitute approval of the rezoning. Such approval shall only be <br />considered when the City Council finds that all "Conditions for Development Plan <br />Approval" as identified herein have been met. <br />Page 14 of 15 <br />