Laserfiche WebLink
�RTICLE IV. DISTRICT REGULATIONS Page 13 of 15 <br /> with the city relating to the terms of the RPUD development, and shall also provide such <br /> financial guarantees as the city requires or deems necessary. Such agreement may take the <br /> form of: <br /> (1) A development contract; <br /> (2) A site improvement performance agreement; and/or <br /> (3) Another form of binding instrument as may be required by the city. <br /> (d) Fina/ site and building plan. Approval of a final site and building plan for the entire RPUD <br /> or for specific parts of the RPUD shall be subject to the procedures outlined in this division. The <br /> final site and building plan shall contain information as required by the city, including the <br /> following: <br /> (1) Detailed utility, street, grading and drainage plans; <br /> (2) Detailed building elevations and floor plans; <br /> (3) Detailed landscaping, sign and lighting plans; and <br /> (4) Detailed trail plan. <br /> (e) Substantial compliance. The final site and building plan shall be in substantial compliance <br /> with the approved master development plan. Substantial compliance shall mean: <br /> (1) Buildings, parking areas, roads and trails are in substantially the same location as <br /> previously approved; <br /> (2) The number of residential living units has not increased or decreased from that <br /> approved in the master development plan; <br /> (3) The gross floor area of any individual building has not been increased from that <br /> approved in the master development plan; <br /> (4) There has been no increase in the number of stories in any building; <br /> (5) Open space has not been decreased or altered to change its original design or <br /> intended use; and <br /> (6) All special conditions required on the master development plan by the city have <br /> been incorporated into the final site and building plan. <br /> Approval of a final site and building plan shall signify approval of all plans necessary prior to application <br /> for a building permit, subject to conformance with any conditions on the approval and subject to other <br /> necessary approvals by the city. <br /> (� Simu/taneous review. Applicants may combine the final site and building plan review with <br /> the master development plan review by submitting all information required for both stages <br /> simultaneously. <br /> (g) Basis for approval; conditions. In evaluating a site and building plan, the planning <br /> commission and city council shall base their recommendations and actions regarding approval <br /> of a RPUD on a consideration of the following: <br /> (1) Compatibility of the proposed plan with this section and consistency with the goals, <br /> policies, and objectives of the comprehensive plan and surface water management plan; <br /> (2) Preservation of the site in its natural state to the greatest extent practicable by <br /> minimizing tree and soil removal and designing grade changes to be in keeping with the <br /> general character and appearance of neighboring properties; <br /> (3) Creation of compatible relationships befinreen buildings and open spaces both on <br /> the site and adjacent to it, incorporating natural site features and with existing and future <br /> buildings having a visual relationship to the development, giving special attention to: <br /> http://library3.municode.com/defaulbDocView/13094/1/109/113 6/24/2008 <br />