My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-011356 - new residence
Orono
>
Property Files
>
Street Address
>
K
>
Kelly Avenue
>
2515 Kelly Avenue - 20-117-23-12-0038
>
Permits/Inspections
>
1999-011356 - new residence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:49:35 PM
Creation date
3/30/2017 1:04:42 PM
Metadata
Fields
Template:
x Address Old
House Number
2515
Street Name
Kelly
Street Type
Avenue
Address
2515 Kelly Avenue
Document Type
Permits/Inspections
PIN
2011723120038
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drywall Work <br /> Drywall shall consist of 1/2 inch wa11 and 5/8 inch ceiling drywall applied with screws. Drywall in <br /> shower areas sha11 be water resistant to a height of six-feet and constructed with concrete tile backer <br /> boaxd. All exposed corners shall be reinforced with metal corners. Three coats of drywall cement sha11 be <br /> applied over all taping joints and screw and nail openings. All joints and openings shall be taped and <br /> sanded. Nails may be used in corners to secure drywall to walls along with screws. <br /> Bathroom Accessories —Part of Ceramic Tile Allowance <br /> � <br /> Soap dishes, towel bars and toilet paper dispensers are included in bathrooms and showers and are <br /> a part of the ceramic tile allowance. <br /> Ceramic Tile — See Allowance <br /> Ceramic tile installed in showers to be placed over vinyl membrane on floor. Ceramic shower wa11s <br /> to have cement board installed 72" from floor and ceramic tile installed from floor 7" high. Ceramic tile <br /> shower floor installed on wire lath and cement. Ceramic tile on tub decks to be installed on cement and <br /> wire lath. Ceramic tile installed in lower levels and on existing cement floors to be set with thin-set and <br /> bonding agent to floor. The following tile material allowances apply: <br /> Walls $4.00/sq ft list <br /> Bath floors $5.00/sq ft list <br /> Marble tiles $10.00/sq ft list <br /> Slate tiles $10.00/sq ft list <br /> Heating Work <br /> The work under this section shall consist of builder furnishing all materials, labor and equipment <br /> necessary to provide a complete heating system of the type specified in compliance with the Minnesota <br /> State Statute 116H.12 regarding natural gas fueled furnaces. A forced air conditioning heating system <br /> shall be installed with complete electrical controls, blower, furnace, ducts, registers, and a11 necessary <br /> equipment for a complete heating environment. Warm air ducts and cold air returns are to be placed as <br /> required. The heating specifications are as follows: <br /> • System#1 <br /> Lennox G26Q 4/5-125 @ 91 +AFiTE <br /> Lennox HS26-060(5 tons A/C)@ 12+SEER <br /> Aprilaire#550 Humidifier <br /> Honeywell Electronic Air Cleaner <br /> Vanee Air to Air(H.E. 2.6) <br /> 2 Zone Auto Controls <br /> Zone A- 1a�floor—23 supplies/8 returns <br /> Zone B -Basement— 16 underground supplies/5 returns <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.