My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
info on Grasspave2/Gravelpave2
Orono
>
Property Files
>
Street Address
>
K
>
Kelly Avenue
>
2507 Kelly Avenue - 20-117-23-12-0063
>
Misc
>
info on Grasspave2/Gravelpave2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:50:08 PM
Creation date
3/30/2017 11:40:29 AM
Metadata
Fields
Template:
x Address Old
House Number
2507
Street Name
Kelly
Street Type
Avenue
Address
2507 Kelly Avenue
Document Type
Misc
PIN
2011723120063
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ ..o <br /> B. Related W'ork: <br /> l. Subgrade preparation under Section 02200 Earthwork. 5 6 3 � <br /> 2. Subsurface drainage materials- Section 027I0 Subsurface Drainage, whea needed <br /> 3. Irrigation instailation - Section 0281 Q Irrigation, when needed. <br /> 1.03 Quatity Assurance <br /> A. Foilow Section 01340 requirements. <br /> B. Installation: Performed only by skilled workpeople with satisfactory record of performance on <br /> landscaping or paving projects of compazable size and quality. <br /> 1.0� Submittals <br /> A. Submit manufacturer's product data and instaltation instructions. <br /> B. Submit a 10" x 10" section of Grasspave2 material for review. Reviewed and accepted sarnples <br /> will be returned to the contractor. <br /> C. Submit material certificates for base course and sand fill materials. <br /> 1.0� Delivery, Storage,and Hand[ing <br /> A. Protect Grasspave2 units from damage during delivery and store under tarp to protect from <br /> sunlight, when time from delivery to installation exceeds one week. Keep Hydrogrow in a dark and dry <br /> location. <br /> 1.06 Project Condihons <br /> A. Review installation procedures and coordinate Grasspave2 work with other work affected. <br /> Generally, Grasspave2 is installed at the same time as project grass installation, neazly the last site <br /> construction activity. <br /> B. A!1 hard surface paving adjacent to Grasspave2 azeas, including concrete walks and asphatt paving <br /> must be completed prior to instailation of Grasspave2. <br /> C. Gradients for grass porous paving surfaces can vary fram flat to 20%, depending upoa vehicle types <br /> to use the surface. Please note that firelanes, or other emergency vehicles,will generally require a <br /> gradient that is less than 6%. If there aze any questions regarding existing gradients on this project, <br /> please contact the Project Designer, or Invisibie Structures, Inc. <br /> D. Cold weather: <br /> 1. Do not use frozen materials or materials mixed or coated with ice or frost. Be careful in <br /> handIing rolls of Grasspave2 in temperatures below 50 degrees F, as product connectors become stiff <br /> and can separate, and Che individual units will retain the roil curl until warmed to room temperature <br /> (aided by placement in sun for 15 to 20 minutes). If cold weather is anticipated, Grasspave2 can be <br /> 6/2�/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.