Laserfiche WebLink
�� � <br /> '"'f�.. i �m^" [�1 <br /> DINIENSIOi�IS: All dimensions and elevations in�alving new work <br /> Tying into or governed by existinq construetian shall be field <br /> checked by the contractor andlor the subcontractor prior to <br /> fabrication of any wark. The verified dimensions and elevations <br /> shall appear and be n:oted as such on the first shop drawing submitted. <br /> ASSUMPTI4NS: The contractor shall take extraordinary precautions <br /> corcerning preservatian of the building durinq demolition and new <br /> construction work. Further, he shall agree to assume all <br /> responsibility ior the preservation of this property. <br /> NOTIF�CATION; The cantractor shall natify the <br /> architect/engineer immediately of any discrepancies between <br /> construction documents and actual field conditior.s. <br /> GENERAL: <br /> These drawings do not include necessary components for constzuction <br /> safety. <br /> The structural desiqn is based only on the canopy in its completed <br /> s�ate. Contractors and their subs shall take wh�tever precautions <br /> are necessary to G�ithstand all horizontai and vertical loadings <br /> that may be encauntered during the construction prior ta completion <br /> of the canopy. <br /> Shauld any questions arise or conflicts with other <br /> trades develop contact the Architect/Engineer immediately, <br />