Laserfiche WebLink
REc�rd�� <br /> SEP 1 8 2006 <br /> MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY <br /> Division of Construction Codes and Licensing CITY OF ORO(�p <br /> REPORT ON PLANS <br /> Plans and specifications on plumbing: Skin Care Doctors Addition,2765 Kelly Parkway,Orono, <br /> Hennepin County,Minnesota,Plan No.075598 <br /> OWNERSHIP: <br /> SUBMTTTER(S): G R Mechanical,Plumbing&Heating Contractor, 12401 Ironwood Circle, Suite 500,Rogers, <br /> Minnesota 55374 <br /> Plans Dated: <br /> ��.�. <br /> Date Received: September 6,2006 <br /> Date Reviewed: September 14,2006 <br /> SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the <br /> Minnesota Plumbing Code, as amended,apply,and does not cover the water supply or sewerage system to which <br /> this plumbing system is connected. The review is based upon the supposition that the data on which the design is <br /> based are correct,and that necessary legal authority has been obtained to construct the project. The <br /> responsibility for the design of structural features and the efficiency of equipment must be taken by the project <br /> designer. Approval is contingent upon satisfactory disposition of any requirements included in this report. <br /> Special care should be taken to insure that the material and installation of the plumbing system are in accordance <br /> with the provisions of the Minnesota Plumbing Code. A copy of the approved plans and specifications should <br /> be retained at the project location for future reference. .. <br /> A set of the identified plans and specifications is being returned to G R Mechanical. Enclosed is a copy of the <br /> report and transmittal letter to be forwarded to the project owner. <br /> INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of <br /> the Minnesota Plumbing Code. As specified in Minnesota Rules,part 4715.2830,no plumbing work may be <br /> covered prior to completing the required tests and inspections. Provisions must be ma.de for applying an air test <br /> at the time of the roughing-in inspection as outlined in Minnesota Rules,part 4715.2820,subpart 2,of the code. <br /> A manometer test,as specified in Minnesota Rules,part 4715.2820,subpart 3,is required at the time of the � <br /> fmished plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota <br /> Department of Labor and Industry.when an installation for a state contract job,licensed facility, or project in an <br /> axea where there is no local administrative authority is ready fbr an inspection and test. To schedule inspections, <br /> contact the state plumbing standards representative for your region,or call Jim Peterson at 651/284-5889. <br /> REQiIIREMENT(S): <br /> 1. The submitted plans indicate that the new fixtures will be served by existing water distribution piping. <br /> Verify that the existing pipes are sized to accommodate the added fixtures(see Minnesota Rules, <br /> part 4715.3800). <br /> 2. 'The maximum water volume per flush of a floor-mounted water closet shall be 1.6 gallons. Water closets <br /> shall comply with American National Standards Institute A112.19.6--1990(see Minnesota Statutes, <br /> Section 326.37, subpart 2). <br /> 3. A full-size vent stack(3-inch minimum)must be provided for every building(see Minnesota Rules, <br /> part 4715.2520, subpart l). This stack must be continuous in size from its base to its terminal and should be <br /> the most remote stack from the location where the building drain leaves the building. Verify that a full-size <br /> vent stack exists for this building. <br />