My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#4823-concept plan approval-2002
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2765 Kelley Parkway - 33-118-23-12-0002
>
Resolutions
>
#4823-concept plan approval-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:29 PM
Creation date
3/29/2017 9:05:52 AM
Metadata
Fields
Template:
x Address Old
House Number
2765
Street Name
Kelley
Street Type
Parkway
Address
2765 Kelley Parkway
Document Type
Resolutions
PIN
3311823120002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 1 � � <br /> ��� <br /> � O� <br /> O O <br /> ��. CITY of ORONO � <br /> � � <br /> ��t �G'�' RESOLUTION OF THE CITY COUNCIL <br /> �S� No. 4 � 2 � <br /> configuration and location to maintain a pedestrian corridor that is separated from <br /> Old Crystal Bay Road. An easement will be required for this existing trail. <br /> Sidewalks/trails within the Kelley Parkway and High�vay 12 rights-of-way aze <br /> subject to approval by Orono and MnDOT respectively. <br /> 8. Stormwater management is an ovemding concern with development of this site, <br /> since ponding is not proposed �vithin the property. Stormwater management is <br /> proposed to be provided by stormwater catch basins and storm sewer lines which <br /> would discharge to a proposed storm sewer throujh properties to the east, then <br /> eventually outletting into a regional stormwater pond to be located approximately <br /> 1/4 mile east of the property. This regional pond is proposed as an espansion <br /> of an existing MnDOT stormwater pond by Dahlstrom Development LLC to <br /> serve their proposed 50-acre development surroundin� that pond. The timing of <br /> expansion of the MnDOT pond may not coincide with applicants intended <br /> schedule for the medical office. In addition to the City of Orono, MnDOT and <br /> the Minnehaha Creek �Vatershed District have approval authority over the <br /> applicants' stormwater mana;ement plan. <br /> 9. The City Council finds that the development of this critical corner property will <br /> set the standard for the quality, character, context and compatibility of <br /> development desired by the City for Kelley Parkway. While Orono has not <br /> created specific design guidelines for commercial or residential development <br /> within the HiDhway 12 corridor area, minimum standards for site desi� and <br /> buildin� construction have been incorporated into the applicable zonin� codes. <br /> In order to ensure that development of the property will result in an expression <br /> of Orono's open space character and ima�e, City Council �vill herein establish <br /> minimum Concept Plan Approval conditions to be met by the developer in order <br /> to gain Development Plan Approval. <br /> 10. The City Council finds that the proposed rezonin� and proposed development of <br /> the site for a medical office building is appropriate for the property, will not <br /> have negative impacts on the surroundin� properties when all Concept Plan <br /> Approval conditions are met, and is in keepin� with the goals, policies and <br /> philosophies of the City. : <br /> PaJe 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.