My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
energy analysis
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2750 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
energy analysis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:44 PM
Creation date
3/28/2017 12:54:16 PM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • 1 ' <br />� � Xcel Energy� <br /> � <br /> ENGINEERING ASSISTANCE STUDY PREAPPROVAL APPLICATION <br /> BUSINESS CUSTOMER INFORMATION <br /> Companyname City of Orono Datesubmitted May 19, 2010 <br /> Billing address PO Box 66 ��ty Crystal Bay State MN ZIP 55323 <br /> Buildingaddresslifdifferent) 2�50 Kelley Parkway �iTy Orono State MN ZIP 55356 <br /> Contactperson�print) Lyle Oman Phone 952-249-4625 Fax 952-249-4616 <br /> E-mail* Building Sq.Ft. 19, 0 0 0 <br /> *By providing your e-mail address,you are granting Xcel Energy permission to send further e-mails regarding our programs and services. <br /> Xcel Energy premise number.(EIec) �❑� 2❑ 6❑�❑1 � 8❑�❑ (Natural gas) ❑❑❑❑❑❑�❑❑❑ <br /> Customer is an Xcel Energy ❑X Electric customer ❑Retail gas customer ❑Transport gas customer* Rate Code__________________ <br /> "Gas transport customers do not qualify for gas rebates, <br /> Type of space(i.e.office,school) Of f iCe Do you have a maintenance agreementfor your building? ❑Yes ❑No <br /> If yes,please name maintenance agreement contact: <br /> ENGINEERIN6 FIRM INFORMATION <br /> Engineering Firm performing study�consulting firm) MEP ASSOCiat2S, LLC <br /> Engineering Firm address 7607 Equitable Dr City Eden Prairie State MN ZIP 55344 <br /> Principal Investigator performing study Sean Sonnabend <br /> If not professional engineer,please provide qualifications below and attach relevant experience: <br /> aualifications Professional Engineer seans@mepassociates . com <br /> Phone 952-224-4488 Fax 952-224-4489 E-mail* <br /> *By providing your e-mail address,you are granting Xcel Energy permission to send further e-mails regarding our programs and services <br /> Type of Study: X❑Cooling System Replacement ❑Custom Efficiency ❑Refrigeration X❑Space/process heating <br /> XCEL ENERGY FUNDING <br /> Xcel Energy will provide a study rebate for studies to help customers identify and implement energy-saving opportunities.Xcel Energy will rebate up <br /> to 50 percent of the cost of the Study,not to exceed$15,000.In order to receive a rebate,the study must be preapproved and a study rebate form must <br /> be submitted no later than three(3)months after study completion.To obtain Xcel Energy rebate approval for a study,a customer and the selected <br /> Engineering Firm should complete this form and attach a proposal addressed to the customer.(Please refer to"Proposal Requirements"section.) <br /> Note:The Xcel Energy Funding Authorization section of the application must be signed prior to initiation oi a Study to qualify for Xcel Energy study <br /> rebate.The Study is limited to the evaluation of a potential energy impact recommissioning project�s►.The customer may expand the study scope to <br /> include other project-related work. <br /> ENERGY USE POTENTIAL <br /> Xcel Energy realizes that one of the principle outcomes of the Study will be an estimate of the energy use and savings obtained from a proposed <br /> project.However,Xcel Energy requires some preliminary information about the energy use potential prior to approval of the Study to be able to assess <br /> the value of the Study itself. <br /> Existing peak electric/natural gas demand of equipment or process being studied 61 . 1 kW or MCF <br /> Existing annual electricity/natural gas consumption of equipment or process being studied 2 2 3 , 73 0 kWh or MCF <br /> ESTIMATED ENERGY IMPACT POTENTIAL OF THE PROPOSED PROJECT SCOPE <br /> Electric Peak Demand 3 5 %Increase Decrease Electricity Consumption: 2 0 %Increas Decrease <br /> Natural Gas Peak Demand %Increase/Decrease Natural Gas Consumption: %Increase/Decrease <br /> Approximate payback of proposed project 2 5 years* (*This is an estimate only,please provide if available) <br /> p.1 of 4 09-06-537 06/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.