Laserfiche WebLink
1 • 1 ' <br />� � Xcel Energy� <br /> � <br /> ENGINEERING ASSISTANCE STUDY PREAPPROVAL APPLICATION <br /> BUSINESS CUSTOMER INFORMATION <br /> Companyname City of Orono Datesubmitted May 19, 2010 <br /> Billing address PO Box 66 ��ty Crystal Bay State MN ZIP 55323 <br /> Buildingaddresslifdifferent) 2�50 Kelley Parkway �iTy Orono State MN ZIP 55356 <br /> Contactperson�print) Lyle Oman Phone 952-249-4625 Fax 952-249-4616 <br /> E-mail* Building Sq.Ft. 19, 0 0 0 <br /> *By providing your e-mail address,you are granting Xcel Energy permission to send further e-mails regarding our programs and services. <br /> Xcel Energy premise number.(EIec) �❑� 2❑ 6❑�❑1 � 8❑�❑ (Natural gas) ❑❑❑❑❑❑�❑❑❑ <br /> Customer is an Xcel Energy ❑X Electric customer ❑Retail gas customer ❑Transport gas customer* Rate Code__________________ <br /> "Gas transport customers do not qualify for gas rebates, <br /> Type of space(i.e.office,school) Of f iCe Do you have a maintenance agreementfor your building? ❑Yes ❑No <br /> If yes,please name maintenance agreement contact: <br /> ENGINEERIN6 FIRM INFORMATION <br /> Engineering Firm performing study�consulting firm) MEP ASSOCiat2S, LLC <br /> Engineering Firm address 7607 Equitable Dr City Eden Prairie State MN ZIP 55344 <br /> Principal Investigator performing study Sean Sonnabend <br /> If not professional engineer,please provide qualifications below and attach relevant experience: <br /> aualifications Professional Engineer seans@mepassociates . com <br /> Phone 952-224-4488 Fax 952-224-4489 E-mail* <br /> *By providing your e-mail address,you are granting Xcel Energy permission to send further e-mails regarding our programs and services <br /> Type of Study: X❑Cooling System Replacement ❑Custom Efficiency ❑Refrigeration X❑Space/process heating <br /> XCEL ENERGY FUNDING <br /> Xcel Energy will provide a study rebate for studies to help customers identify and implement energy-saving opportunities.Xcel Energy will rebate up <br /> to 50 percent of the cost of the Study,not to exceed$15,000.In order to receive a rebate,the study must be preapproved and a study rebate form must <br /> be submitted no later than three(3)months after study completion.To obtain Xcel Energy rebate approval for a study,a customer and the selected <br /> Engineering Firm should complete this form and attach a proposal addressed to the customer.(Please refer to"Proposal Requirements"section.) <br /> Note:The Xcel Energy Funding Authorization section of the application must be signed prior to initiation oi a Study to qualify for Xcel Energy study <br /> rebate.The Study is limited to the evaluation of a potential energy impact recommissioning project�s►.The customer may expand the study scope to <br /> include other project-related work. <br /> ENERGY USE POTENTIAL <br /> Xcel Energy realizes that one of the principle outcomes of the Study will be an estimate of the energy use and savings obtained from a proposed <br /> project.However,Xcel Energy requires some preliminary information about the energy use potential prior to approval of the Study to be able to assess <br /> the value of the Study itself. <br /> Existing peak electric/natural gas demand of equipment or process being studied 61 . 1 kW or MCF <br /> Existing annual electricity/natural gas consumption of equipment or process being studied 2 2 3 , 73 0 kWh or MCF <br /> ESTIMATED ENERGY IMPACT POTENTIAL OF THE PROPOSED PROJECT SCOPE <br /> Electric Peak Demand 3 5 %Increase Decrease Electricity Consumption: 2 0 %Increas Decrease <br /> Natural Gas Peak Demand %Increase/Decrease Natural Gas Consumption: %Increase/Decrease <br /> Approximate payback of proposed project 2 5 years* (*This is an estimate only,please provide if available) <br /> p.1 of 4 09-06-537 06/2009 <br />