My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01148 - alarm system
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Permits/Inspections
>
2014-01148 - alarm system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:42 PM
Creation date
3/28/2017 12:31:42 PM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Permits/Inspections
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y L <br /> w"J�1�;,�l,�+F���i►�,�{+�'+4�+� - <br /> BE SAFE. <br /> PRELlMINARY INSTALLATION REVIEWS ' <br /> Electrical Contractors Responsibilities: <br /> » Contractor to field verify building conditions, exact device locations and material <br /> prior to performing any work or ordering of materials. <br /> » Safeguarding all material shipped to the o�ce or job site. <br /> » Store all items (including all documentation)in a clean, dry, and safe place until <br /> needed. <br /> » Notify all appropriate personnel if an existing system must be shut down while the <br /> new system is being installed. <br /> » *Instakl all conduit and wiring, mount and terminate all field devices/equipment <br /> including installation of end-of-line devices. <br /> » `Maintain an as-buift copy of any supplied drawings for field changes or additions and <br /> locations of end-of-fine devices. <br /> » *Check all wiring for opens,grounds and shorts. <br /> » Identify high voltage circuit breaker number and location of breaker inside <br /> any connected cabinet. <br /> » *Troubleshoot and repair of any field wiring problems. <br /> » ``Terminate wiring in control panels. <br /> » "`Set addresses on addressable devices. <br /> » "Schedule final/phased installation at least five (5)days in advance. <br /> » Please do not power up system. <br /> » Detectors shall not be installed until after the construction cleanup of afl trades is ' <br /> complete and final. (NFPA 72) <br /> » For Fire Alarm Panels, coordinate with owner to have two(2)telephone lines <br /> installed for monitoring (one fine for security systems)prior to final testinc�. � <br /> "Note: These items may be done by SimplexGrinnell or our sub-contractor if install is not part of <br /> the our contract with the Electrical Contractor. <br /> FINAL TESTING AND CHECK-OUT <br /> can <br /> 763-367-5000 <br /> or <br /> 800-292-4111 <br /> Please natify SimplexGrinnell at least five (5)workinq davs prior to the date you need <br /> our Technical Representative to check out this project. <br /> We cannot guarantee short notice service due to prior scheduling commitments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.