Laserfiche WebLink
, <br /> Job:ORONO POLICE DEPARTMENT , <br /> Hydraulic Analysis for : 1 <br /> Graph Labels <br /> Label Description Values <br /> Flow (gpm) Pressure (psi) <br /> S1 Supply point#1 -Static 0 63 <br /> S2 Suppiy point#2-Residual 888 60 <br /> D1 Elevation Pressure � 9•� <br /> D2 System Demand 715.3 55.4 <br /> Curve Intersections & Safety Margins <br /> Intersection Safety Margin <br /> Curve Name <br /> Pressure (psi) Flow (gpm) Pressure (psi) @ Flow (gpm) <br /> Supply 60.8 759.2 5.6 715.3 <br /> Open Heads <br /> Required Calculated <br /> Head Ref. Head Type Coverage K-Factor <br /> Density Flow Pressure Density Flow Pressure <br /> (s4•�) (9Pm/Psi�/z) (9pm/sq.ft) (9Pm) (PS�) (9pm/s4�) �9Pm) (P51) <br /> S3 Overhead 42 5.6 0.15 63 7 0.487 20.5 13.3 <br /> Sprinkler <br /> S4 Overhead 42 5.6 0.15 6.3 7 0.522 21.9 15.3 <br /> Sprinkler <br /> S5 Overhead 42 5.6 0.15 6.3 7 0.486 20.4 13.3 <br /> Sprinkler <br /> S6 Overhead 42 5.6 0.15 6.3 7 0.521 21.9 15.3 <br /> Sprinkler <br /> S� Overhead 104 5.6 0.15 15.6 7.8 0.15 15.6 7.8 <br /> Sprinkler <br /> 58 Overhead 104 5.6 0.15 15.6 7.8 0.165 17.2 9.4 <br /> Sprinkler <br /> S9 Overhead 104 5.6 0.15 15.6 7.8 0.184 19.1 11.6 <br /> Sprinkler <br /> S1 Overhead 42 5.6 0.15 6.3 7 0.489 20.5 13.4 <br /> Sprinkler <br /> S10 Overhead 104 5.6 0.15 15.6 7.8 0.201 20.9 13.9 <br /> Sprinkler <br /> S11 Overhead 104 5.6 0.15 15.6 7.8 0.15 15.6 7.8 <br /> Sprinkler <br /> S12 Overhead 104 5.6 0.15 15.6 7.8 0.165 17.2 9.4 <br /> Sprinkler <br /> S13 Overhead 104 5.6 0.15 15.6 7.8 0.184 19.1 11.6 <br /> Sprinkler <br /> S14 Overhead 104 5.6 0.15 15.6 7.8 0.201 20.9 13.9 <br /> Sprinkler <br /> File:O:\Projects\124310-ORONO POLICE STATION\Design\CFSP\124310-Orono Police Department <br /> Remodel.dwg <br /> Date 9/19/2014 Copyright OO 2002-2012 Tyco Fire Protection Products Page 6 <br />