Laserfiche WebLink
iss�e��s: so�uosro� R.v No.: o <br /> sRAUN <br /> INTERTEC <br /> Special inspection Daily Report <br /> City of Orono, MN. Page 1 of 1 <br /> Report No.: Structural Steel#2 Date of this Report: 10-20-14 <br /> Project Name: Orono Police Department F�cpansion Project No.: B1�4-05902 <br /> Project Address: 2730 Kelly Parkway <br /> Client: City of Orono Client Project No.: � <br /> Weather: Partly Cloudy PM Mark Flynn Temperature: ° F <br /> Type of Inspection: Inspection Coverage: <br /> ❑ Continuous ❑ Masonry ❑ Rebar Placeme►rt ❑ Foundations ❑ Special Cases: <br /> � Periodic �Welding 8 Bofting ❑ Concrete Placement ❑ Fireproofing <br /> ❑ Piles 8� Piers ❑ Tendon Placement ❑ Soils <br /> __--- --_----- — — — - <br /> ---- <br /> Did the archited or engineer authorize changes to City-approved plans? ❑Yes (Listed Below) ❑ No <br /> Description and location of work completed: <br /> 1} Screen wall plete fillet welds to tube steel column and bar joist at Roof Level Grid B-C 6 to North revised detail 11/501 <br /> (top side only completed). No discrepancy noted <br /> List tests perFormed: <br /> �sual <br /> • Are there any discrepancies noted from this day's observations? Yes ❑ No � <br /> • Are there any outstanding discrepancies on this project? Yes � No [� <br /> � If yes, see attached Summary Sheet. <br /> ■ Repo►1 given to Contractor: Yes � No ❑ <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans, speciflcations, and <br /> applicabte workmanship provisions of the current IBC, except as noted above. <br /> --� Graham Dan <br /> Signed: �"�'- � Date: 10-20-14 <br /> Print Full Name: Daniel P. G�aham I.D. No.: 1054095 S1&S2 !� <br /> -- + <br />